首页 | 本学科首页   官方微博 | 高级检索  
     

基于 ANP2FCE 模型的水电工程环境影响评价
引用本文:张 青,路金喜,刘智奇.基于 ANP2FCE 模型的水电工程环境影响评价[J].南水北调与水利科技,2015,13(3):453-456.
作者姓名:张 青  路金喜  刘智奇
作者单位:(河北农业大学 城乡建设学院, 河北 保定 071000)
摘    要:针对水电工程环境影响评价体系中各指标间相互影响的特点,将网络层次分析法(ANP)和模糊综合评价法(FCE)相结合,对水电工程环境影响进行综合评价。首先根据网络层次分析法(ANP)构建水电工程环境影响评价的网络结构模型,确定所有评价指标的权重,该方法克服了以往运用层次分析法(AHP)确定指标权重不能反映指标之间相互影响关系的弊端;然后引入模糊综合评价(FCE)的思想和方法对水电工程环境影响进行评价,提出水电工程环境影响评价的ANP-FCE模型。对我国北方某水电工程进行实例分析的结果显示,该评价模型合理、有效。

关 键 词:网络层次分析法(ANP)  模糊综合评价(FCE)  Super  Decisions软件  环境影响评价  水电工程

Environmental impact assessment of hydropower project based on ANP2 FCE model
ZHANG Qing,LU Jin xi,LIU Zhi qi.Environmental impact assessment of hydropower project based on ANP2 FCE model[J].South-to-North Water Transfers and Water Science & Technology,2015,13(3):453-456.
Authors:ZHANG Qing  LU Jin xi  LIU Zhi qi
Affiliation:( College of Urban and Rural Construction, H ebei A gricultural University, Baoding 071000, China)
Abstract:T here is interaction between each index in the environmental impact assessment system of the hydropower project. An2 alytic network process( ANP) and fuzzy comprehensive evaluation( FCE) were used to perform the comprehensive evaluation of the environmental impact of hydropower project. First, the network structure model for the environmental impact assessment of hydropower project was developed based on ANP and the weights of all evaluation indexes were determined. T his method over2 comes the disadvantage of not reflecting the interaction between the indexes using the analytic hierarchy process( AHP) . T hen, the theory and method of FCE were introduced to perform the environmental impact assessment of hydropower project, and the ANP2FCE model to evaluate environmental impact of hydropower project was proposed. Finally, the model was applied to a hy2 dropower project in north China and the results suggested the evaluation model is reasonable and effective.
Keywords:analytic hierarchy process( ANP)  fuzzy comprehensive evaluation(FCE)  Super Decisions software  environmental impact assessment  hydropower project
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《南水北调与水利科技》浏览原始摘要信息
点击此处可从《南水北调与水利科技》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号