首页 | 本学科首页   官方微博 | 高级检索  
     

Xeset 2水电站三梁岔管结构优化分析
引用本文:何新红,石广斌,牛天武.Xeset 2水电站三梁岔管结构优化分析[J].西北水电,2009(2).
作者姓名:何新红  石广斌  牛天武
作者单位:中国水电顾问集团西北勘测设计研究院,西安,710065
摘    要:老挝Xeset 2水电站压力钢管主管内径为3 m,由三梁钢岔管连接2个内径为1.6 m的支管.岔管HD值较大,在用规范规定的解析法计算的基础上,用三维有限元法对岔管结构进行了优化分析,并提出合理的三梁钢岔管体型.

关 键 词:Xeset2水电站  三梁岔管  解析法  三维有限元

Analysis of optimization of Y bifurcated pipe structure for Xeset 2 hydropower station
HE Xin-hong,SHI Guang-bin,NIU Tian-wu.Analysis of optimization of Y bifurcated pipe structure for Xeset 2 hydropower station[J].Northwest Water Power,2009(2).
Authors:HE Xin-hong  SHI Guang-bin  NIU Tian-wu
Affiliation:Northwest Hydro Consulting Engineers;CHECC;Xi'an 710065;China
Abstract:For Xeset 2 hydropower station in Laos,the main penstock has an inner diameter of 3m,connected to 2 branch pipes of 1.6 m inner diameter each by Y bifurcated pipe.Due to greater HD value of bifurcated pipe,its structure is analyzed and optimized by 3D finite element method on the basis of analytical calculation specified in standards,and rational shape of Y bifurcated pipe is proposed.
Keywords:Xeset 2 hydropower station  Y bifurcated pipe  analytic method  3D finite element  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号