首页 | 本学科首页   官方微博 | 高级检索  
     

水电站坝下尾水渠集鱼流场模拟研究
引用本文:贺新娟,李润伟,孙万光,李广一.水电站坝下尾水渠集鱼流场模拟研究[J].水利水电技术,2021,51(12):133-140.
作者姓名:贺新娟  李润伟  孙万光  李广一
作者单位:1. 中水东北勘测设计研究有限责任公司,吉林 长春 130021; 2. 水利部寒区工程技术研究中心,吉林 长春 130061
基金项目:国家重点研发计划项目( 2018YFC0407303)
摘    要:为减缓大坝阻隔对鱼类洄游的不利影响,水电工程需要建设有效的过鱼设施疏通其洄游通道。高寒区高坝大库工程过鱼设施建设是一个极其复杂的技术问题,目前国内类似工程尚无成功运用经验。实际过鱼设施内流场条件十分复杂,会产生不利于鱼类上溯的水流形态。基于此原因,对某水电站工程坝下尾水流场进行了数值模拟。研究表明,在机组运行时,电站尾水渠左右两侧发电尾水主流的边缘是明显具有流速梯度分布的区域,符合鱼类聚集的水流特征,具备布置鱼道进口条件。这样可根据尾水位的变化开启两侧不同进口诱鱼,且在机组停运时,可开启左侧进口诱鱼。

关 键 词:水电站  过鱼设施  坝下尾水渠  数值模拟  集鱼流场  
收稿时间:2019-12-17

Simulative study on fish-collecting flow field of tailrace channel under dam for hydropower station
HE Xinjuan,LI Runwei,SUN Wanguang,LI Guangyi.Simulative study on fish-collecting flow field of tailrace channel under dam for hydropower station[J].Water Resources and Hydropower Engineering,2021,51(12):133-140.
Authors:HE Xinjuan  LI Runwei  SUN Wanguang  LI Guangyi
Affiliation:1. China Water Northeastern Investigation Design and Research Co. Ltd. ,Changchun 130021, Jilin,China; 2. Research Center on Cold Region Engineering Technology, Ministry of Water Resources,Changchun 130061,Jilin,China
Abstract:In order to alleviate the adverse impact from the blockage of dam on fish migration,effective fish-passing facility is necessary to be built up for hydropower project to unlock fish migration passage. It is a very complicated technical matter to construct the fish-passing facility for the project of high dam and huge reservoir in high-cold area,while no successful application experiences are there for the similar projects at present in China. The flow field condition inside the actual fish-passing facility is quite complicated,under which the flow pattern that is unfavorable for the upstream migration of fish is to be formed. For this reason,a numerical simulation is carried out on the flow field of the tailrace channel under the dam of a hydropower station. The study result shows that both the right and left sides of the tailrace channel for the hydropower plant are the edges of the main stream of the tail water from power generation and the obvious areas of velocity gradient distribution during the operation of the hydropower plant,which are consistent with the characteristics of the flow conditions for fish aggregation,thus have the conditions for arranging fish-way. In this way,different inlets on the both sides can be opened to lure fish in accordance with the change of the tailrace water level,while the inlets on the left side can be opened for fish luring when the power generating units are shut down.
Keywords:hydropower station  fish-passing facility  tailrace channel under dam  numerical simulation  fish-collecting flow field  
点击此处可从《水利水电技术》浏览原始摘要信息
点击此处可从《水利水电技术》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号