高寒地区抽水蓄能电站地下厂房施工期通风、保暖、散烟系统研究
引用本文:费万堂,马雨峰,王兰普,陈磊,王波,高昌炎.高寒地区抽水蓄能电站地下厂房施工期通风、保暖、散烟系统研究[J].水利水电技术,2017,48(4):90-98.
作者姓名:费万堂  马雨峰  王兰普  陈磊  王波  高昌炎
作者单位:(1.河北丰宁抽水蓄能有限公司,河北丰宁068350;2.华北科技学院安全工程学院,河北三河101601)
摘    要:以河北省丰宁抽水蓄能电站地下厂房施工为研究对象,根据各洞室贯通的先后顺序,将地下洞室群施工期的通风分为一期通风、二期通风、三期通风3个阶段,不同阶段设计不同的方案。研究设计出高寒地区冬季隧道内施工防寒保暖散烟系统,结合管道通风和自然通风的方式进行通风。现场应用效果明显,各掌子面及掘进施工断面粉尘和有害气体浓度在短时间内大幅度降低,施工断面通道附近粉尘浓度降低到10 mg/m3及以下的水平,通风洞主体通道粉尘浓度甚至降低到5 mg/m~3以下的水平。该技术实现了洞室群内施工周期各阶段风流的有序流动更新,降低了施工成本,保证了施工质量,创造了良好的施工环境,为同类型高寒地区水电站建设提供了经验参考。

关 键 词:高寒地区  抽水蓄能电站  冬季施工  防寒保暖散烟系统  管道通风  自然通风  
收稿时间:2016-12-13

Study on ventilation-thermal insulation-smoke dispersion system for construction period of pumped storage hydropower station in alpine region
FEI Wantang,MA Yufeng,WANG Lanpu,CHEN Lei,WANG Bo,GAO Changyan.Study on ventilation-thermal insulation-smoke dispersion system for construction period of pumped storage hydropower station in alpine region[J].Water Resources and Hydropower Engineering,2017,48(4):90-98.
Authors:FEI Wantang  MA Yufeng  WANG Lanpu  CHEN Lei  WANG Bo  GAO Changyan
Affiliation:(1.Hebei Fengning Pumped Storage Hydropower Co., Ltd., Fengning068350, Hebei, China; 2.College of Safety Engineering, North China Institute of Science and Technology, Sanhe101601, Hebei, China)
Abstract:By taking the construction of the underground powerhouse of Fengning Pumped Storage Hydropower Station as the study object, the ventilation during the construction period of the cavern group of the pumped storage hydropower station is divided into three phases, i.e. Phase I ventilation, Phase II ventilation and Phase III ventilation in accordance with the break-through order of all the caverns; for which different schemes are designed for different phases. A cold-proof-thermal insulation-smoke dispersion system for the construction in tunnel during winter within an alpine region is studied and designed; by which the ventilation is made with the mode of combining the duct ventilation with the natural ventilation. The in situ application effect is obvious: the concentrations of dusts and harmful gases at all the excavation faces and construction sections are largely lowered in a short period, i.e. the dust concentration near the passage of construction section is lowered below 10 mg/m3 and more, while the dust concentration incoming into the main passage of the ventilation adit is even lowered below 5 mg/m3 and more. Thus, the orderedly flowing and renewing of the air-flows in all the construction phases in the cavern group during the construction period are realized, and then the construction cost is lowered, the construction quality is ensured and a better construction environment is created as well. The study provides an experience reference for the construction of the similar hydropower station in alpine region.
Keywords:alpine region  pumped storage hydropower station  winter construction  cold-proof-thermal insulation-smoke dispersion system  duct ventilation  natural ventilation  