首页 | 本学科首页   官方微博 | 高级检索  
     

一,二维连接的河口冲淤数模
引用本文:张世奇.一,二维连接的河口冲淤数模[J].水利水电技术,1997,28(7):14-18.
作者姓名:张世奇
作者单位:中国水利水电科学研究院
摘    要:在河口,河流动力和海洋动力相互作用,动力因素极为复杂。对于多沙河口,其冲淤演变规律更为复杂,河口的范围包括河口段河道,入海口及口外邻近海域。本建立的适用于河口三部分水域的一、二维连续的冲淤数学模型,其中上能反映多沙河口冲淤演变频繁的现象。通过数模计算探讨了黄河口入海水沙与潮流、风吹流及波浪相互作用下的输沙规律,并实际计算了黄河口的冲淤地形及规划方案中各条流路河口的淤积范围等。

关 键 词:冲淤  数学模型  黄河口  河口泥沙  泥沙

Mathematical Model of Linking 1-D and 2-D of Erosion and Sedimentation for an Estuary
Zhang Shiqi.Mathematical Model of Linking 1-D and 2-D of Erosion and Sedimentation for an Estuary[J].Water Resources and Hydropower Engineering,1997,28(7):14-18.
Authors:Zhang Shiqi
Affiliation:China Institute of Water Resources and Hydropower Research
Abstract:The force functions of a river and a sea are interacted in an estuary. The force functions are complicated. The range of a river mouth includes the river channel, the inlet to sea and the sea off the inlet. The mode1 for an estuary is estab1ished. The computed field in the mode1 includes the three parts of a whole water body. Through linking the 1-Dimensional and 2-Dimensional mathematical model, the complicated evolution for an estuary with high sediment concentration can be calcu1ated. Using the mathematical model, the computation of sediment transport under the interaction of runoff, tide and wind-driven currents and wave in the Yellow River Mouth has been carried out. Through the calculating, the law of erosion and sedimentation is ' studied. Furthermore, the bed deformation for a long period and the sedimentation areas of the river mouthes of the planned channels are calculated, too.
Keywords:mathematical model of erosion and sedimentation  1-D and 2-D linking  Yellow River Estuary
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号