老渡口水电站面板堆石坝防渗墙施工
引用本文:王汝军,梁谦.老渡口水电站面板堆石坝防渗墙施工[J].湖北水力发电,2009(3):49-52.
作者姓名:王汝军  梁谦
作者单位:王汝军,WANG Rujun(武汉大学设计研究总院,湖北,武汉,430072);梁谦,LIANG Qian(湖北省水利水电勘测设计院,湖北,武汉,430070)  
摘    要:介绍老渡口水电站面板堆石坝工程坝基趾板混凝土防渗墙施工的特点和难点,通过精心的组织,合理确定施工方案、严格控制质量技术措施,开创了防渗墙在动水中施工的先例,确保了防渗墙如期完工的目标。

关 键 词:老渡口水电站  面板堆石坝  趾板  混凝土防渗墙  施工

Construction of impervious wall in CFRD of Laodukou Hydropower Station
WANG Rujun,LIANG Qian.Construction of impervious wall in CFRD of Laodukou Hydropower Station[J].Hubei Water Power,2009(3):49-52.
Authors:WANG Rujun  LIANG Qian
Affiliation:1. Design & Research Institute of Wuhan University, Wuhan 430072, China; 2. Hubei Investigation & Design Institute of Water Conservancy & Hydropower, Wuhan 430070, China)
Abstract:The technical difficulties in construction of impervious wall in Laodukou CFRD built in flowing water are described, these difficulties are overcome by eleborately drawing up construction scheme and strictly carrying out quality control in every construction procedure.
Keywords:Laodukou Hydropower Station  concrete faced rockfill dam ( CFRD )  toe slab  concrete impervious wall  construction