摘    要:观测仪器预埋在混凝土后,其事故发生的概率尽管很小,但其发生将无法使安全监测等工作顺利进行,本文分析总干线三级泵站弦式应变计施工后无法读测的原因,供以后解决类似问题参考。

关 键 词:万家寨引黄工程  泵站  弦式应变计  预埋  故障分析
文章编号:1006-8139(2002)03-68-02

Analysis of Embeded String Strain Meter's Breakdown
Li Chuanglin.Analysis of Embeded String Strain Meter''s Breakdown[J].Shanxi Hydrotechnics,2002(3):68-69,74.
Authors:Li Chuanglin
Affiliation:Li Chuanglin
Abstract:In horizontal outlet tunnel,Pompin g station No.3,the general main line,Wanjiazhai YRDP(Yellow River Diversion Project),four of the string strain meters had b een embeded on July 30,2000.Howecver,since November 27,2000,the breakdown had been discovered one after another,t he strings' frequency of vibration readings had not been able to be taken.In this p aper the cause of the breakdown is analyzed.The writers hold that the pos-sibility that the temperature cause d the breakdown of the string strain meters can not be ruled out.
Keywords:String Strain Meter Breakdown Analy sis