东山供水工程9号隧洞施工方案比选
引用本文:闫海雷.东山供水工程9号隧洞施工方案比选[J].山西水利科技,2012(2):31-33,41.
作者姓名:闫海雷
作者单位:山西省水利水电勘测设计研究院,山西太原,030024
摘    要:东山供水工程的9号隧洞全长22.64km,其中土洞长2.3km,岩石洞长20.34km,隧洞地形条件复杂,施工支洞布置难度较大,通过比较分析,确定合理的施工方法,即土洞段采用钻爆法施工,岩石洞段采用隧洞掘进机施工。

关 键 词:9号隧洞  钻爆法施工  隧洞掘进机(TBM)施工  比选

Comparing and Selecting Plan to Construct NO.9 Tunnel in Dongshan Water Supply Project
YAN Hai-lei.Comparing and Selecting Plan to Construct NO.9 Tunnel in Dongshan Water Supply Project[J].Shanxi Hydrotechnics,2012(2):31-33,41.
Authors:YAN Hai-lei
Affiliation:YAN Hai-lei
Abstract:In Dongshan Water Supply Project,the total length of NO.9 tunnel is 22.64 km,in which,the length of soil tunnel is 2.3 km,and the length of rock tunnel is 20.34 km.The tunnel’s topographical condition is complex,to set up construction drifts is difficult.By means of comparing and selecting alternative plans,the reasonable construction methods are determined: drill-blast tunneling method is adopted in soil tunnel section,TBM tunneling method in rock tunnel section.
Keywords:NO  9 tunnel  drill-blast tunneling method  TBM tunneling method  comparison and selection