层板包扎尿素合成塔检验中的缺陷 |
| |
引用本文: | 程冰,王春茂.层板包扎尿素合成塔检验中的缺陷[J].化工机械,2009,36(5):525-528. |
| |
作者姓名: | 程冰 王春茂 |
| |
作者单位: | [1]山东省安泰化工压力容器检验中心,山东省济南市 250014 [2]山东省特种设备检验研究院,山东省济南市 250014 |
| |
基金项目: | 国家863计划先进制造技术领域重大产品和重大设施寿命预测技术专题;层板包扎高压容器剩余寿命试验评价技术 |
| |
摘 要: | 介绍了层板包扎尿素合成塔全面检验中常见的各种缺陷及其成因,并附以缺陷的典型照片以供参考。
|
关 键 词: | 尿素合成塔 缺陷 检测 |
Flaws in the Inspection of the Multilayer Binding Urea Synthesizing Towers |
| |
Affiliation: | CHENG Bing ,WANG Chunmao ( 1 Antai Chemical Pressure Vessel Inspection Center of Shandong Province, Jinan, 250014, Shandong, China; 2Special Equipment Inspection Institute of Shandong Province, Jinan, 250013, Shandong, China ) |
| |
Abstract: | Various common flaws and their causes of the multilayer binding urea synthesizing towers were presented,and some typical photos of the flaws were available for reference. |
| |
Keywords: | Urea Synthesizing Tower Flaw Inspection |
本文献已被 维普 万方数据 等数据库收录! |
|