首页 | 本学科首页   官方微博 | 高级检索  
     

搞好选煤厂建设项目采购管理的探讨
引用本文:宋志宏,段志军.搞好选煤厂建设项目采购管理的探讨[J].煤炭加工与综合利用,2001(6):26-29.
作者姓名:宋志宏  段志军
摘    要:分析了我国目前选煤厂建设项目设备采购管理方面存在的采购与设计分离、业主责任定位不明确等问题 ,结合国外工程公司的成功经验 ,提出了搞好项目采购的制度保障及项目采购管理的具体设想 ,如组建工程公司采购部、严格管理程序、对项目费用及进度进行综合控制等

关 键 词:选煤厂建设  设备采购  问题  管理  制度保障
文章编号:1005-8397(2001)06-0026-04
修稿时间:2001年8月20日

Inquiry on better procurement administration for a construction project coal preparation plant construction
Abstract:Analyzed were the present problems existed in a construction project of coal preparation plant, such as separation of design and equipment procurement, responsibility of proprietor undefined, etc. In relation of successful experience from foreign engineering company, concrete considerations on ensuring procurement regulations and procurement administration were proposed, such as setting up a procurement department under the engineering company, strict administration procedures, and comprehensive control of the project expenses and engineering time schedule.
Keywords:construction of coal preparation plant  equipment procurement  problem  administration  regulation ensuring
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号