首页 | 本学科首页   官方微博 | 高级检索  
     

基于可能-满意度方法的特大型矿井开采规模研究
引用本文:王红胜,张东升,陈勇,马立强,刘玉德.基于可能-满意度方法的特大型矿井开采规模研究[J].中国矿业大学学报,2007,36(2):148-152.
作者姓名:王红胜  张东升  陈勇  马立强  刘玉德
作者单位:1. 中国矿业大学,能源与安全工程学院,江苏,徐州,221116;中国矿业大学,煤炭资源与安全开采国家重点实验室,江苏,徐州,221008
2. 中国矿业大学,能源与安全工程学院,江苏,徐州,221116;兖矿集团,济三煤矿,山东,济宁,272169
3. 中国矿业大学,能源与安全工程学院,江苏,徐州,221116
基金项目:国家自然科学基金;教育部跨世纪优秀人才培养计划
摘    要:特大型矿井持续稳定高效生产的关键技术之一是其开采规模的合理确定.以济三煤矿为例,在分析大量翔实数据的基础上,把可能一满意度方法应用到采矿系统工程之中,从“需要”和“可能”2个角度对济三煤矿开采规模进行了多目标预测.对14个单因素进行可能一满意度分析并对部分因素进行了并合,得出开采规模的总可能一满意度;最后得出济三煤矿合理开采规模及其所依赖的条件.结果表明:济三煤矿要达到1000万t/a的目标,必须提高过断层的速度和最大限度地解放村庄压滞的煤炭.济三煤矿在目前的开采技术条件下,开采规模以600万t/a最为合理,此时可能一满意度为0.93.

关 键 词:可能-满意度  多目标决策  开采规模  并合  特大型矿井
文章编号:1000-1964(2007)02-0148-05
修稿时间:05 12 2006 12:00AM

Study of Rational Mining Capacity in Super-Huge Coal Mine Based on Possibility-Satisfiability Method
WANG Hong-sheng,ZHANG Dong-sheng,CHEN Yong,MA Li-qiang,LIU Yu-de.Study of Rational Mining Capacity in Super-Huge Coal Mine Based on Possibility-Satisfiability Method[J].Journal of China University of Mining & Technology,2007,36(2):148-152.
Authors:WANG Hong-sheng  ZHANG Dong-sheng  CHEN Yong  MA Li-qiang  LIU Yu-de
Abstract:The rational decision of mining capacity is one of the key technologies in super-huge coal mine with durative, steady and high efficiency production. Taking Jisan coal mine for example, based on the analysis of data, the mining capacity of Jisan coal mine was predicted multiobjectively using the possibility-atisfiability method from the demand and possibility. 14 factors were analyzed with possibility-satisfiability method and combined partly. The rational mining capacity and its depending conditions of Jisan coal mine were obtained. The results show that the velocity of across faults should be increased and the coal seam occupied by villages should be released to the maximum to achieve the mining capacity of 1 000 ten thousand t/a for Jisan coal mine. On the present condition of mining technology of it, 600 ten thousand t/a is the most rational mining capacity, and the possibility-satisfiability degree is 0.93.
Keywords:possibility-satisfiability  multiple objective decision  mining capacity  combination  super-huge coal mine
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号