首页 | 本学科首页   官方微博 | 高级检索  
     

高潜水位矿区土地复垦的工程措施及其选择
引用本文:卞正富,张国良.高潜水位矿区土地复垦的工程措施及其选择[J].中国矿业大学学报,1991,20(3):71-78.
作者姓名:卞正富  张国良
摘    要:

关 键 词:土地  复垦  地面下沉  工程措施  矿区

Engineering Measures and Their Choice for Land Reclamation in Mining Subsidence Area with High Phreatic Level
Bian Zhenju Zhang Guoliang.Engineering Measures and Their Choice for Land Reclamation in Mining Subsidence Area with High Phreatic Level[J].Journal of China University of Mining & Technology,1991,20(3):71-78.
Authors:Bian Zhenju Zhang Guoliang
Affiliation:Bian Zhenju Zhang Guoliang
Abstract:The realignment of surface damaged by mining subsidence and land reuse after realignment are two major tasks of land reclamation plan of mining area, and the realignment of surface is the foundation and preparation of accomplishing land reuse. On the basis of analysing the features of the land damaged by mining, the paper proposes four kinds of engineering measures for the realignment of subsided land as follows:(l) measures of mining;(2) measures of lowering phreatic level;(3) measures of tillage and irrigation; and (4) measures of raising subsided surface. The paper also analyses the peculiarities of land reclamation further, and the flow chart of the process of selecting reclamation measures is given. The method of AHP (Analysis of Hierarchy Process) is employed successfully in selecting reclamation measures and an example of application is presented.
Keywords:Land reclamation  ground subsidence
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号