首页 | 本学科首页   官方微博 | 高级检索  
     

基于群体AHP的采掘计划灰色关联分析评价
引用本文:韩可琦,蔡恒兵.基于群体AHP的采掘计划灰色关联分析评价[J].中国矿业大学学报,1999,28(3):208-211.
作者姓名:韩可琦  蔡恒兵
作者单位:中国矿业大学采矿工程系,江苏徐州,221008
摘    要:通过对矿井采掘过程的调研与分析,设计了衡量采掘计划的12项评价指标,利用群体AHP法确定出各指标的权重,然后采用灰色关联度分析对其进行评价和排序,较好地从多个采掘计划方案中选择出比较合理的方案.从而保证矿井采掘的正常接替,使矿井生产系统的设备能力得以充分发挥.该方法为采掘计划多方案优选提供了一种思路和方法

关 键 词:群体AHP,采掘计划,灰色关联分析,评价
修稿时间:1998-09-14

Analysis and Evaluation of Excavation Plans by Grey Relevancy System Based on Group AHP
Han Keqi,Cai Hengbing.Analysis and Evaluation of Excavation Plans by Grey Relevancy System Based on Group AHP[J].Journal of China University of Mining & Technology,1999,28(3):208-211.
Authors:Han Keqi  Cai Hengbing
Abstract:By the investigation into mine excavation procedure, 12 indices to evaluate excavation plans are schemed out, the weight of each index is determined by using group AHP. These indices are evaluated and sorted using the grey relevancy degree analysis. The more reasonable plan may be obtained from all excavation plans, thus ensuring better arrangement of coal mining and roadway excavation and making full use of the whole production system of mines and the ability of working facilities. This method is a new idea for selecting excavation scheme.
Keywords:group AHP  excavation scheme  grey relevancy analysis  evaluation
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号