首页 | 本学科首页   官方微博 | 高级检索  
     

水平旋喷桩在富水砂层浅埋暗挖隧道中的应用
引用本文:周前,赵德刚.水平旋喷桩在富水砂层浅埋暗挖隧道中的应用[J].山东大学学报(工学版),2014,44(4):52-57.
作者姓名:周前  赵德刚
作者单位:广州地铁设计研究院有限公司, 广东 广州 510000
摘    要:针对深圳某浅埋暗挖隧道穿越富水砂层的施工过程进行三维数值模拟分析,讨论了暗挖隧道在有、无水平旋喷桩超前支护措施时,围岩、支护的变形及应力变化规律。结合现场地面、初支量测成果,对数值模拟分析结果进行了验证、对比,得出水平旋喷桩超前支护对控制地面沉降、支护变形及支护应力效果显著。分析了现场水平旋喷桩施工存在的问题,有针对性的提出了解决方案与发展方向。所得结论为暗挖隧道的顺利施工提供了可靠依据,可为类似地质条件、结构形式的暗挖隧道设计、施工提供借鉴。

关 键 词:水平旋喷桩  数值模拟  监控量测  富水砂层  浅埋暗挖隧道  
收稿时间:2014-05-19

Application of the horizontal jet grouting pile in water-bearing sandy layer of shallow excavating tunnel
ZHOU Qian,ZHAO Degang.Application of the horizontal jet grouting pile in water-bearing sandy layer of shallow excavating tunnel[J].Journal of Shandong University of Technology,2014,44(4):52-57.
Authors:ZHOU Qian  ZHAO Degang
Affiliation:Guangzhou Metro Design & Research Institute Co., Ltd, Guangzhou 510000, Guangdong, China
Abstract:The construction process of a shallow buried tunnel crossing the water rich sand layer was analyzed in Shenzhen by 3-D numerical simulation, the deformation and the stress of the surrounding rock were discussed under the circumstances of using horizontal jet grouting pile or not in the process of excavating. Based on the numerical simulation and the measurement results, a conclusion could be drawn that the application of the horizontal jet grouting pile had significant effect in controlling the deformation, the subsidence of support and the stress of support. Furthermore, some solutions were put forth to some problems in the construction of horizontal jet grouting pile and the direction of the development. The obtained conclusions could provide experience and numerical support for the design and construction of the similar situation.
Keywords:water-bearing sandy layer  horizontal jet grouting pile  shallow excavating tunnel  numerical simulation  monitoring and measurement  
本文献已被 CNKI 等数据库收录!
点击此处可从《山东大学学报(工学版)》浏览原始摘要信息
点击此处可从《山东大学学报(工学版)》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号