首页 | 本学科首页   官方微博 | 高级检索  
     

大规模光伏接入受端电网方案综合决策
引用本文:刘晓明,丛旖旎,李文博,刘玉田.大规模光伏接入受端电网方案综合决策[J].山东大学学报(工学版),2019,49(4):115-122.
作者姓名:刘晓明  丛旖旎  李文博  刘玉田
作者单位:1. 国网山东省电力公司经济技术研究院, 山东 济南 2500212. 国网山东省电力公司烟台供电公司, 山东 烟台 2640003. 山东大学电网智能化调度与控制教育部重点实验室, 山东 济南 250061
基金项目:国网山东省电力公司科技资助项目
摘    要:提出一种基于模糊层次分析和逼近理想解排序的方案评估比选方法,用于大规模光伏接入受端电网方案的综合决策。以系统安全稳定性、光伏出力间歇性、经济性和可扩展性为准则,建立大规模光伏电站接入受端电网方案评估体系,对候选方案各指标进行量化评估;考虑决策者主观偏好的模糊性质,采用模糊层次分析法确定评估体系中各指标的权重,并利用逼近理想解排序法进行多属性决策得到推荐接入方案。山东电网算例展示所提综合决策方法的全过程,结果表明利用该方法可直观地反映各候选方案的优劣,并给出合理的决策结果。

关 键 词:光伏电站  综合决策  模糊层次分析  逼近理想解排序  
收稿时间:2019-01-21

Comprehensive decision-making method for large-scale photovoltaic system integrated to receiving-end power grid
Xiaoming LIU,Yini CONG,Wenbo LI,Yutian LIU.Comprehensive decision-making method for large-scale photovoltaic system integrated to receiving-end power grid[J].Journal of Shandong University of Technology,2019,49(4):115-122.
Authors:Xiaoming LIU  Yini CONG  Wenbo LI  Yutian LIU
Affiliation:1. Economic & Technology Research Institute, State Grid Shandong Electric Power Company, Jinan 250021, Shandong, China2. Yantai Power Supply Company, State Grid Shandong Electric Power Company, Yantai 264000, Shandong, China3. Key Laboratory of Power System Intelligent Dispatch and Control of Ministry of Education, Shandong University, Jinan 250061, Shandong, China
Abstract:This paper proposed a comprehensive decision-making method based on fuzzy analytic hierarchy process (FAHP) and technique for order preference by similarity to ideal solution (TOPSIS) for large-scale photovoltaic system integrated to receiving-end power grid. A decision-making evaluation index system was established to quantify the indexes of grid-connection schemes, in which main influence factors considered were security and stability, intermittence of PV, economy, and extendibility. Taking into account the fuzziness of the preferences of decision-makers, the FAHP algorithm was applied to determine the weights of indexes. The TOPSIS algorithm was adopted to make the multi-objective decision between schemes to get the TOPSIS solution as the best grid-connection scheme. The case study on Shandong power grid demonstrated the whole process of the comprehensive decision-making method and indicated that the method could reflect the merits and demerits of different schemes visually, with which we could get the reasonable decision results.
Keywords:photovoltaic system  comprehensive decision-making  FAHP  TOPSIS  
本文献已被 CNKI 等数据库收录!
点击此处可从《山东大学学报(工学版)》浏览原始摘要信息
点击此处可从《山东大学学报(工学版)》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号