渤海油田测调一体分注关键技术改进及应用
引用本文:杨树坤,李越,李翔,郭宏峰,季公明,史景岩. 渤海油田测调一体分注关键技术改进及应用[J]. 石油化工高等学校学报, 2021, 34(4): 91-96. DOI: 10.3969/j.issn.1006-396X.2021.04.015
作者姓名:杨树坤  李越  李翔  郭宏峰  季公明  史景岩
作者单位:中海油田服务股份有限公司 油田生产事业部,天津 300459
基金项目:“十三五”国家科技重大专项“大型油气田及煤层气开发、渤海油田高效开发示范工程”(2016ZX05058)
摘    要:针对渤海油田常规测调一体分层注水工艺测调效率偏低、无法实现分层静压测试等问题,开展了测调一体分注工艺关键技术改进.通过合理优化管柱结构,实现注水压力平衡,减小大排量注水造成的管柱蠕动;配水器采用桥式通道设计,大幅度增加过流面积,降低层间干扰,进一步提高测调效率;同时在配水器本体增设传压孔,建立地层-油管传压通道,并配套...

关 键 词:渤海油田  测调一体  压力平衡  静压测试  桥式通道
收稿时间:2020-09-02

Improvement and Application of the Key Technology of Separate Injection in Bohai Oilfield
Shukun Yang,Yue Li,Xiang Li,Hongfeng Guo,Gongming Ji,Jingyan Shi. Improvement and Application of the Key Technology of Separate Injection in Bohai Oilfield[J]. Journal of Petrochemical Universities, 2021, 34(4): 91-96. DOI: 10.3969/j.issn.1006-396X.2021.04.015
Authors:Shukun Yang  Yue Li  Xiang Li  Hongfeng Guo  Gongming Ji  Jingyan Shi
Affiliation:Production Optimization Division,China Oilfield Services Limited,Tianjin 300459,China
Abstract:Some strategies for improvement of the key technology of testing?adjusting integrated separate injection technology have been investigated, due to much lower efficiency of conventional testing?adjusting integrated separate injection technology, which cannot accomplish layered static pressure testing. Through optimizing the string structure to improve the pressure balance during water injection, the creep of the string caused by the large displacement water injection is reduced. Design of the bridge channel of the water distributor greatly increases the flow area,reduces the interlayer interference, and further improves the testing?adjusting efficiency. Meanwhile, the pressure hole is added in the water distributor body to establish stratum?tubing pressure transfer channel, and the static pressure testing instrument is equipped for further testing of the layered static pressure. The improved technology works well in application, the deployment efficiency has been significantly improved, which takes only 5 hours to complete the deployment of 6 layers. The overpressure layer can be successfully picked out during the layered static pressure test, which provides a basis for the layered injection allocation adjustment. The adaptability of the improved technology in Bohai oilfield is significantly enhanced.
Keywords:Bohai oilfield  Integration of testing and adjusting  Pressure balance  Static pressure test  Bridge channel  