首页 | 本学科首页   官方微博 | 高级检索  
     

基于温度循环迭代精确施加斜拉桥初始索力
引用本文:王海军,王子山,刘红钊,魏华,吴德强.基于温度循环迭代精确施加斜拉桥初始索力[J].沈阳工业大学学报,2018,40(2):224-228.
作者姓名:王海军  王子山  刘红钊  魏华  吴德强
作者单位:1. 沈阳工业大学 建筑与土木工程学院, 沈阳 110870; 2. 中铁十五局集团 第五工程有限公司, 天津 300000
基金项目:沈阳市科学技术计划项目(F16-204-1-09)
摘    要:为了准确施加斜拉桥的恒载初始索力,提出了一种基于ANSYS平台控制温度索力迭代施加的方法,从而精确施加斜拉桥初始成桥索力.以设计索力作为目标值,考虑斜拉桥几何非线性因素,初始索力以初始温度的形式施加到斜拉索上,运用APDL二次开发软件编制了斜拉桥成桥索力迭代计算程序,并将该程序应用于双塔双索面钢-混凝土叠合梁斜拉桥结构分析中.结果表明,桥塔两侧斜拉索的计算索力与目标索力误差均在5%以内,该初始索力迭代方法具有方便快捷和效率高的优点.

关 键 词:初始索力  ANSYS平台  迭代方法  设计索力  初始温度  二次开发  计算程序  结构分析  

Precisely imposed initial cable force for cable stayed bridge based on temperature cycle iteration
WANG Hai-jun,WANG Zi-shan,LIU Hong-zhao,WEI Hua,WU De-qiang.Precisely imposed initial cable force for cable stayed bridge based on temperature cycle iteration[J].Journal of Shenyang University of Technology,2018,40(2):224-228.
Authors:WANG Hai-jun  WANG Zi-shan  LIU Hong-zhao  WEI Hua  WU De-qiang
Affiliation:1. School of Architecture and Civil Engineering, Shenyang University of Technology, Shenyang 110870, China; 2. The 5th Construction Co. Ltd., China Railway 15th Bureau Group, Tianjin 300000, China
Abstract:In order to precisely impose the constant load initial cable force for cable stayed bridge, an iteration imposed method for cable force through controlling temperature based on the ANSYS platform was proposed, and thus the initial cable force of cable stayed bridge could be precisely applied at the completed stage of the bridge. The design cable force was taken as the target value, the geometric nonlinear factors of cable stayed bridge were considered, and the initial cable force was imposed to the cable stayed bridge in the form of initial temperature. The iterative calculation program for the cable force of cable stayed bridge at the completed stage was compiled with the APDL two-developed software, and the program was applied to the structure analysis of twin tower double cable plane steel-concrete composite girder cable stayed bridge. The results show that the errors of both calculated and target cable forces for the stayed cable on both sides of bridge tower are within 5%. Therefore, the iteration method for initial cable force has the advantages including the convenience and shortcut as well as high efficiency.
Keywords:initial cable force  ANSYS platform  iterative method  design cable force  initial temperature  secondary development  calculation procedure  structure analysis  
本文献已被 CNKI 等数据库收录!
点击此处可从《沈阳工业大学学报》浏览原始摘要信息
点击此处可从《沈阳工业大学学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号