首页 | 本学科首页   官方微博 | 高级检索  
     


Beam-track interaction of high-speed railway bridge with ballast track
Authors:Bin Yan  Gong-lian Dai and Hua-ping Zhang
Affiliation:[1]Department of Civil Engineering, Central South University, Changsha 410075, China [2]Maintenance Departments of Guangzhou Municipal Engineering, Guangzhou 510100, China
Abstract:Based on the construction bridge of Xiamen-Shenzhen high-speed railway (9–32 m simply-supported beam + 6×32 m continuous beam), the pier-beam-track finite element model, where the continuous beam of the ballast track and simply-supported beam are combined with each other, was established. The laws of the track stress, the pier longitudinal stress and the beam-track relative displacement were analyzed. The results show that reducing the longitudinal resistance can effectively reduce the track stress and the pier stress of the continuous beam, and increase the beam-track relative displacement. Increasing the rigid pier stiffness of continuous beam can reduce the track braking stress, increase the pier longitudinal stress and reduce the beam-track relative displacement. Increasing the rigid pier stiffness of simply-supported beam can reduce the track braking stress, the rigid pier longitudinal stress and the beam-track relative displacement.
Keywords:high-speed railway  beam-track interaction  ballast track  rail longitudinal force  continuous beam
本文献已被 维普 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号