首页 | 本学科首页   官方微博 | 高级检索  
     

特高压GIS现场安装用全封闭移动式厂房研制与应用
引用本文:刘建楠,田文敏,张国强,阎国增,倪向萍,卞秀杰.特高压GIS现场安装用全封闭移动式厂房研制与应用[J].中国电力,2017,50(6):108-112.
作者姓名:刘建楠  田文敏  张国强  阎国增  倪向萍  卞秀杰
作者单位:1. 国家电网公司交流建设分公司,北京 100052; 2. 北京送变电公司,北京 102401; 3. 华东送变电工程公司,上海 201803
基金项目:国家电网公司科技项目(SGZJ0000JJJS1400634)
摘    要:特高压GIS现场安装用全封闭移动式厂房是一种用于户外GIS设备安装的新型工装,能够在工程现场营造一种全封闭的安装环境,克服外部环境对GIS安装的影响,保证GIS安装质量,提高安装效率,并为安装人员提供良好的工作环境。介绍了特高压GIS现场安装用全封闭移动式厂房的研制背景、基本结构形式与应用方式、工程应用情况及社会经济效益等内容。特高压GIS现场安装用全封闭移动式厂房在皖电东送工程、浙北—福州特高压交流输变电工程中进行了试用及全线推广应用,取得了非常好的效果,目前已确定在后续全部特高压交流工程中普遍应用。

关 键 词:特高压GIS  1000kVGIS安装  全封闭厂房  移动厂房  室内化安装  工厂化安装  
收稿时间:2017-01-25

Manufacture and Application of the Fully-Enclosed Self-Assembly Building for UHV GIS Installation
LIU Jiannan,TIAN Wenmin,ZHANG Guoqiang,YAN Guozeng,NI Xiangping,BIAN Xiujie.Manufacture and Application of the Fully-Enclosed Self-Assembly Building for UHV GIS Installation[J].Electric Power,2017,50(6):108-112.
Authors:LIU Jiannan  TIAN Wenmin  ZHANG Guoqiang  YAN Guozeng  NI Xiangping  BIAN Xiujie
Affiliation:1. State Grid AC Engineering Construction Company, Beijing 100052, China;2. Beijing Electric Power Transmission and Transformation Company, Beijing 102401, China;3. East China Power Transmission and Transformation Engineering Company, Shanghai 201803, China
Abstract:The fully-enclosed self-assembly building is a new sort of facility for outdoor UHV GIS installation, which creates a fully enclosed environment and overcomes the adverse influence of external environment. Hence it can ensure high quality of GIS installation, improve the installation efficiency, and provide good working environment. This paper mainly introduces the development background, basic structure, application mode, engineering application state and social economic benefits of the self-assembly building, which have been successfully used in Anhui-East project and Zhebei-Fuzhou project. Seeing its excellent application outcome, we have decided to popularize the installation of self-assembly building in all the subsequent UHV AC projects in China.
Keywords:UHV GIS  1 000 kV GIS installation  totally-enclosed building  self-assembly building  indoor installation  industrial installation  
本文献已被 CNKI 等数据库收录!
点击此处可从《中国电力》浏览原始摘要信息
点击此处可从《中国电力》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号