首页 | 本学科首页   官方微博 | 高级检索  
     

基于主从博弈的多微电网系统经济优化方法
引用本文:佟新,胡存刚,芮涛.基于主从博弈的多微电网系统经济优化方法[J].中国电力,2019,52(6):68-76.
作者姓名:佟新  胡存刚  芮涛
作者单位:1. 安徽大学 电气工程与自动化学院, 安徽 合肥 230601;2. 教育部电能质量工程研究中心(安徽大学), 安徽 合肥 230601
基金项目:国家重点研发计划资助项目(2016YFB0900400)。
摘    要:随着售电侧电力市场改革的深入,研究多微电网系统的经济优化问题具有重要意义。针对多微电网系统,提出了一种基于主从博弈的经济优化方法。该方法主要由日前优化阶段与实时优化阶段组成。在日前优化阶段,微电网运营商根据日前预测信息和电网电价信息,优化储能单元的日前调度计划;在实时优化阶段,系统运营商根据实时预测信息,通过构建主从博弈模型求解内部最优电价,鼓励微电网运营商参与多微电网系统的电能交易,提升微电网之间的能量共享水平。算例结果表明,本文所提的两阶段经济优化方法可以有效地提升微电网运营商与系统运营商的经济效益,同时降低了多微电网系统的净负荷峰均比。

关 键 词:多微电网  经济优化  主从博弈  两阶段优化  电能交易  
收稿时间:2019-03-26
修稿时间:2019-05-22

Master-Slave Game Based on Economic Optimization Method of Multi-Microgrid System
TONG Xin,HU Cungang,RUI Tao.Master-Slave Game Based on Economic Optimization Method of Multi-Microgrid System[J].Electric Power,2019,52(6):68-76.
Authors:TONG Xin  HU Cungang  RUI Tao
Affiliation:1. School of Electrical Engineering and Automation, Anhui University, Hefei 230601, China;2. Engineering Research Center of Power Quality, Ministry of Education(Anhui University), Hefei 230601 China
Abstract:With the deepening reform of the electricity market on the sale side, it is of great significance to study the economic optimization of multi-microgrid (MMG) system. This paper proposes a master-slave game based economic optimization method of MMG system, which consists of day-ahead optimization stage and real-time optimization stage. In the day-ahead optimization stage, the microgrid operator (MGO) optimizes the schedule of the energy storage units based on the day-ahead forecast information and grid price information; In the real-time optimization stage, the system operator (SO) solves the internal optimal price by constructing master-slave game model based on the real-time forecast information, encourages MGO to participate in energy trading in MMG system, and improves energy sharing between microgrids. The results of case studies show that the two-stage economic optimization method proposed in this paper can effectively improve the benefits of MGO and SO, and reduce the peak-to-average load ratio of MMG system.
Keywords:multi-microgrid  economic optimization  master-slave game  two-stage optimization  electricity trading  
本文献已被 CNKI 等数据库收录!
点击此处可从《中国电力》浏览原始摘要信息
点击此处可从《中国电力》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号