首页 | 本学科首页   官方微博 | 高级检索  
     

基于一种不可行内点法的电力系统无功优化
引用本文:李玉龙,宗伟,袁启洪.基于一种不可行内点法的电力系统无功优化[J].中国电力,2007,40(2):19-21.
作者姓名:李玉龙  宗伟  袁启洪
作者单位:华北电力大学,电力系统保护与动态安全监控教育部重点实验室,北京,102206
摘    要:在应用内点法进行线性规划时,尚不能保证它的全面收敛性。提出了一种新的算法来求解无功线性优化问题。利用潮流雅可比矩阵直接变换求取灵敏度系数,建立无功优化线性规划模型,同时采用一种不可行内点算法来直接求解该问题。IEEE 14节点、30节点、57节点系统的计算结果表明,该算法能有效求解无功优化线性规划问题,同时在初始点的选择上不要求从内点启动,迭代收敛次数稳定,对计算系统的规模不敏感。

关 键 词:无功优化  线性规划  不可行内点  步长
文章编号:1004-9649(2007)02-0019-03
修稿时间:2006-07-24

An infeasible-interior-point algorithm for reactive power optimization problem in power system
LI Yu-long,ZONG Wei,YUAN Qi-hong.An infeasible-interior-point algorithm for reactive power optimization problem in power system[J].Electric Power,2007,40(2):19-21.
Authors:LI Yu-long  ZONG Wei  YUAN Qi-hong
Affiliation:Key Laboratory of Power System Protection and Dynamic Security Monitoring and Control under Ministry of Education, North China Electric Power University, Beijing 102206, China
Abstract:It cannot assure comprehensive convergence when applying interior point algorithm to solve linear programming problem. As to this problem, a novel method was proposed for reactive power optimization in power system. Jacobi matrix of power flow directly transformed into coefficient of sensitivity was employed to form linear programming model of reactive power optimization problem. Then an infeasible interior point algorithm was employed to solve linear programming model of reactive power optimization problem. Simulation results of respectively applying the proposed method to IEEE 14-bus system, 30-bus system as well as and 57-bus system show that this method can illustrates that the proposed strategy is effective, in addition, it is not required to select the initial point from the interior points, the iteration times can be remarkably reduced and convergence is stable.
Keywords:reactive power optimization  linear programming  infeasible-interior-point  pedometer
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号