考虑规模化快充负荷的低压互联配电台区风险评估
引用本文:沈培锋,王徐延,张昊亮,卫志农,徐广开,孙国强.考虑规模化快充负荷的低压互联配电台区风险评估[J].中国电力,2021,54(5):56.
作者姓名:沈培锋  王徐延  张昊亮  卫志农  徐广开  孙国强
作者单位:1. 国网江苏省电力有限公司南京供电公司,江苏 南京 210019;2. 河海大学 能源与电气学院,江苏 南京 210098
基金项目:国网江苏省电力有限公司科技项目(面向规模化电动汽车的柔性台区协同运行与控制关键技术研究及工程示范,J2019066)
摘    要:提出一种基于规模化电动汽车快充负荷的配电台区风险评估方法。首先,以“停车—充电”模式为基础,考虑居民区、商业区不同的充电需求,进行电动汽车快充负荷的模拟;其次,给出配电台区中快充负荷分散接入的传统方式,以及台区低压侧互联的新型接入方式,并基于此提出AC/DC变流器、储能设备的控制策略,建立台区互联的功率模型;最后,以台区变压器为中心,提出包括配变重载、超载和切负荷成本的风险指标,建立配电台区风险评估体系。以南京市某地区示范工程作为算例,讨论分析不同拓扑结构及快充负荷规模下配电台区的安全运行风险,及储能系统的对台区支撑作用。

收稿时间:2020-02-03
修稿时间:2020-03-20

Risk Assessment of Low-Voltage Interconnected Distribution Districts Considering Large-Scale Fast Charging Load
SHEN Peifeng,WANG Xuyan,ZHANG Haoliang,WEI Zhinong,XU Guangkai,SUN Guoqiang.Risk Assessment of Low-Voltage Interconnected Distribution Districts Considering Large-Scale Fast Charging Load[J].Electric Power,2021,54(5):56.
Authors:SHEN Peifeng  WANG Xuyan  ZHANG Haoliang  WEI Zhinong  XU Guangkai  SUN Guoqiang
Affiliation:1. Nanjing Power Supply Company of State Grid Jiangsu Electric Power Co., Ltd., Nanjing 210019, China;2. College of Energy and Electrical Engineering, Hohai University, Nanjing 210098, China
Abstract:A risk assessment method of distribution district is proposed based on large-scale electric vehicle(EV) fast charging load. Firstly, based on the "parking-charging" mode, and considering the different charging needs of residential areas and commercial areas, the EV fast charging load is simulated. Secondly, both the traditional decentralized access mode for fast charging load and the new access mode for low-voltage side interconnection in the distribution districts are given, and the control strategy for AC/DC converter and energy storage equipment is proposed, and the power model of distribution district interconnection is established. Finally, the risk indexes of distribution transformers, including heavy load, overload and load-shedding cost, are put forward, and a risk assessment system of distribution district is established. A demonstration project in Nanjing is taken as an example to analyze the operation risks of the distribution district under different topological structures and fast charging load scales, and the supporting effects of the energy storage system on the distribution district.