发电机100%定子接地保护误动作分析
引用本文:徐金兵,楼国才.发电机100%定子接地保护误动作分析[J].中国电力,2007,40(5):67-70.
作者姓名:徐金兵  楼国才
作者单位:浙江省火电建设公司,调试所,浙江,杭州,310016
摘    要:某电厂600MW机组在发电机空载试验时发生100%定子接地保护动作,经发现设计方案无法满足机组并网前继电保护要求。通过对原来设计方案和机组启动过程出现的问题进行了分析,找出问题的原因,并对原来的设计方案进行优化,对优化后的方案进行了调试,结果表明优化后的方案较好地解决了问题,满足了机组并网前后100%定子接地保护的要求。

关 键 词:定子接地  设计方案  600MW机组
文章编号:1004-9649(2007)05-0067-04
修稿时间:2007-01-14

Analysis of mal-operation for 100%grounding protection of generator stator
XU Jin-bing,LOU Guo-cai.Analysis of mal-operation for 100%grounding protection of generator stator[J].Electric Power,2007,40(5):67-70.
Authors:XU Jin-bing  LOU Guo-cai
Affiliation:Zhejiang Thermal Power Construction Company, Hangzhou 310016,China
Abstract:A 600 MW unit had 100% grounding protection movement when no-load of generator. It was found that the design can't satisfy the requirements of grounding protection before synchronizing of generator. The defect and the trouble of original design scheme were analyzed and the reasons for it were found. The original design scheme was optimized and debug. The result shows that the optimization of design scheme can solve the problem to satisfy the requirements of grounding protection before synchronizing of generator.
Keywords:stator grounding protection  design scheme  600 MW unit  