首页 | 本学科首页   官方微博 | 高级检索  
     

一种基于 PSCAD/EMTDC的同塔四回输电线路三相不平衡最优相序筛选方法
引用本文:刘正富,刘林,赵艳军,盛超,陈晓科.一种基于 PSCAD/EMTDC的同塔四回输电线路三相不平衡最优相序筛选方法[J].广东电力,2014(8):75-79.
作者姓名:刘正富  刘林  赵艳军  盛超  陈晓科
作者单位:广东省智能电网新技术企业重点实验室(广东电网公司电力科学研究院);广东电网公司佛山供电局;
基金项目:广东省智能电网新技术企业重点实验室资助项目(2060299);中国南方电网有限责任公司重点科技项目(K-GD2011-433)
摘    要:同塔双回输电线路采用逆相序排列方式可以很好地解决三相电流不平衡的问题,而同塔四回输电线路的三相不平衡问题要复杂得多,不能简单地采用逆相序排列方式。为此,首先分析了同塔四回输电线路三相不平衡产生的原因,然后利用 PSCAD/EMTDC软件对同塔四回输电线路不同的相序排列方式进行了仿真研究;搭建了基于Multiple-Run模块的同塔四回输电线路最优相序筛选模型,给出了相应的程序流程图,通过该模型可以计算不同目标函数下的最优相序。最后以广东揭阳电网某220 kV和500 kV同塔四回输电线路三相电流不平衡问题为例,利用提出的模型和方法,推荐了最优相序改造方案;该方案已被采纳实施,取得了较好的效果。

关 键 词:同塔四回输电线路  最优相序  三相不平衡  PSCAD/EMTDC软件  Multiple-Run模块

Screening Method for Optimal Phase Sequence of Three Phase Unbalance of Quadruple Circuit Power Transmission Line on the Same Tower Based on PSCAD/EMTDC
Affiliation:LIU Zhengfu,LIU Lin,ZHAO Yanjun,SHENG Chao,CHEN Xiaoke (1. Guangdong Province Key Laboratory of Smart Grid Technology (Electric Power Research Institute of Guangdong Power Grid Corporation), Guangzhou, Guangdong 510080, China; 2. Foshan Power Supply Bureau of Guangdong Power Grid Corporation, Foshan, Guangdong 528000, China)
Abstract:It is able to well solve problem of three phase current unbalance by using inverse phase sequence arrangement for double circuit power transmission line on the same tower while it is more complicated for three phase unbalance for quadrup-le circuit power transmission line on the same tower which means unable to simply use inverse phase sequence arrangement way. Therefore,cause for three phase unbalance of quadruple circuit power transmission line on the same tower was ana-lyzed and simulation studies on different phase sequence arrangement ways were conducted by using PSCAD/EMTDC soft-ware. Optimal phase sequence screening model for quadruple circuit power transmission line on the same tower based on Multiple-Run module was established by which optimal phase sequence under different target functions were able to be calcu-lated. Meanwhile,relevant program flow diagram was proposed. Taking three phase current unbalance of some 220 kV and 500 kV quadruple circuit power transmission lines on same towers in Guangdong Jieyang power grid as examples and using proposed model and method,optimal phase sequence transform scheme was recommended which was adopted and implemen-ted and proved to be of good effectiveness.
Keywords:quadruple circuit power transmission line on the same tower  optimal phase  three phase unbalance  PSCAD/EMTDC software  Multiple-Run module
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号