江口水电厂左岸溢洪道帷幕灌浆试验及效果分析
引用本文:王永刚.江口水电厂左岸溢洪道帷幕灌浆试验及效果分析[J].江西电力,2006,30(4):28-30.
作者姓名:王永刚
作者单位:江西江口水电厂,江西,新余,338027
摘    要:江口水电厂进水闸及左岸溢洪道基础扬压力偏大,灌浆帷幕基本未形成。该文对帷幕灌浆试验及效果进行综合分析,通过灌浆试验,论证了灌浆工艺、材料及施工参数的可行性和合理性,并提出了帷幕灌浆设计及施工的一些建议。

关 键 词:帷幕灌浆  试验  效果  分析
文章编号:1006-348X(2006)04-28-03
收稿时间:2006-05-12
修稿时间:2006-05-12

Left-Spillway Curtain Grouting Experiment and Its Effect Analysis in Jiangkou Hydropower Plant
Wang Yong-gang.Left-Spillway Curtain Grouting Experiment and Its Effect Analysis in Jiangkou Hydropower Plant[J].Jiangxi Electric Power,2006,30(4):28-30.
Authors:Wang Yong-gang
Affiliation:Wang Yong-gang
Abstract:The uplift pressure of the left-spillway and diversion inlet is very great,the cutain didn't form.This article analysed grouting experimention and its effects.Through the experimention,reasoning grouting feasibility and rationality of techniques,material and construction parameters,moreover putting forward some advices on curtain grouting degisn and consruction.
Keywords:curtain grouting  experimention  effect  analysis  