首页 | 本学科首页   官方微博 | 高级检索  
     

考虑主动管理措施的配电网无功补偿双层优化配置
引用本文:严艺芬,吴文宣,张逸,蔡金锭.考虑主动管理措施的配电网无功补偿双层优化配置[J].电力系统保护与控制,2017,45(12):60-66.
作者姓名:严艺芬  吴文宣  张逸  蔡金锭
作者单位:福州大学电气工程与自动化学院,福建 福州 350108,福州大学电气工程与自动化学院,福建 福州 350108;国网福建省电力有限公司,福建 福州 350003,福州大学电气工程与自动化学院,福建 福州 350108;国网福建省电力科学研究院,福建 福州 350007,福州大学电气工程与自动化学院,福建 福州 350108
基金项目:国家高技术研究发展计划(863 计划)(2014AA 051901)
摘    要:为了适应未来大量分布式电源(DG)并网及自动化水平显著提高的主动配电网发展,在规划阶段应该考虑主动管理措施,优化系统运行方式。同时,现有的无功补偿规划研究忽略了DG及负荷的不确定性。为此,计及间歇性DG及负荷的不确定性,提出主动配电网无功补偿双层优化配置模型。上层规划以无功补偿电容器的投资成本、网络损耗费用综合最优为目标函数,下层规划在此基础上考虑调节无功补偿容量及调节有载变压器抽头两种主动管理措施,对每个场景进行优化。采用K-均值聚类法对场景进行缩减,结合和声搜索算法和粒子群算法联合求解模型。通过IEEE33节点算例进行仿真计算,验证所提模型和方法的正确性。

关 键 词:分布式电源  主动配电网  无功补偿  优化配置  主动管理措施
收稿时间:2016/6/22 0:00:00
修稿时间:2016/9/15 0:00:00

Bi-level optimal allocation of reactive power compensation considering active management measure
YAN Yifen,WU Wenxuan,ZHANG Yi and CAI Jinding.Bi-level optimal allocation of reactive power compensation considering active management measure[J].Power System Protection and Control,2017,45(12):60-66.
Authors:YAN Yifen  WU Wenxuan  ZHANG Yi and CAI Jinding
Affiliation:College of Electrical Engineering and Automation, Fuzhou University, Fuzhou 350108, China,College of Electrical Engineering and Automation, Fuzhou University, Fuzhou 350108, China;Sate Grid Fujian Electric Power Company Limited, Fuzhou 350003, China,College of Electrical Engineering and Automation, Fuzhou University, Fuzhou 350108, China;State Grid Fujian Electric Power Research Institute, Fuzhou 350007, China and College of Electrical Engineering and Automation, Fuzhou University, Fuzhou 350108, China
Abstract:In order to adapt to active distribution network which will have large-scale distributed generation (DG) and high level of automation in the future, active management measures must be considered in the planning stage to optimize system operation. And the existing research of distribution network reactive compensation planning ignores the uncertainty of DG and load. Aiming to solve the problems, this paper proposes reactive compensation optimal allocation model in active distribution network based on the uncertainties of intermittent DG and load power. The lowest reactive compensation capacitors investment cost and network loss cost are taken as the objective of upper level. And considering two active management measures including regulating reactive power compensation capacity and regulating the on-load tap changer, the lower level optimizes for each scene. This paper uses K- means clustering method to reduce the scene, and combines with the harmonic search algorithm and particle swarm algorithm to solve the model. And simulative results of IEEE-33 distribution system verify the effectiveness of the model and solution methods. This work is supported by National High-tech R & D Program of China (863 Program) (No. 2014AA051901).
Keywords:distributed generation  active distribution network  reactive power compensation  optimal allocation  active management measure
点击此处可从《电力系统保护与控制》浏览原始摘要信息
点击此处可从《电力系统保护与控制》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号