考虑DG不确定性的主动配电网两阶段无功机会 约束优化方法
引用本文:卢 姬,常俊晓,张云阁,鄂士平,曾垂辉.考虑DG不确定性的主动配电网两阶段无功机会 约束优化方法[J].电力系统保护与控制,2021,49(21):28-35.
作者姓名:卢 姬  常俊晓  张云阁  鄂士平  曾垂辉
作者单位:1.国网浙江省电力有限公司台州供电公司,浙江 台州 318000;2.湖北省电力勘测设计院,湖北 武汉 430000; 3.国网湖北省电力有限公司,湖北 武汉 430077
基金项目:国家重点研发计划项目资助(2017YFB0903705)
摘    要:随着高比例的分布式电源(Distributed generation,DG)并网,传统的确定性无功优化方法难以应对DG和负荷的双侧不确定性,提出了主动配电网的两阶段无功机会约束优化方法。首先将配电网潮流方程线性化和松弛,建立基于混合整数二阶锥的配电网两阶段无功优化模型,分别在第一阶段优化有载调压变压器、并联电容器等离散控制装置,在第二阶段考虑DG的不确定性优化DG的无功出力。然后,通过场景缩减法来减少机会约束优化方法的场景数。在95节点系统的仿真结果表明,与确定性性无功优化方法相比,所提出的两阶段无功机会约束优化方法能有效地消除安全约束越限问题,在略微增加网损的情况下获得了较高的鲁棒性。

关 键 词:不确定性  主动配电网  无功优化  两阶段机会约束优化  缩减场景法
收稿时间:2021/1/19 0:00:00
修稿时间:2021/2/25 0:00:00

Two-stage reactive power chance-constrained optimization method for an active distribution network considering DG uncertainties
LU Ji,CHANG Junxiao,ZHANG Yunge,E Shiping,ZENG Chuihui.Two-stage reactive power chance-constrained optimization method for an active distribution network considering DG uncertainties[J].Power System Protection and Control,2021,49(21):28-35.
Authors:LU Ji  CHANG Junxiao  ZHANG Yunge  E Shiping  ZENG Chuihui
Affiliation:1. Taizhou Power Supply Company of State Grid Zhejiang Electric Power Co., Ltd., Taizhou 318000, China; 2. Hubei Electric Power Survey and Design Institute Co., Ltd., Wuhan 430000, China; 3. State Grid Hubei Electric Power Co., Ltd., Wuhan 430077, China
Abstract:With the high proportion of Distributed Generation (DG) connected to the grid, traditional deterministic reactive power optimization methods cannot deal with the double-sided uncertainties of DGs and load. This paper proposes a two-stage chance-constrained reactive power optimization method for an active distribution network. First, the power flow equation of the network is linearized and relaxed, and a two-stage reactive power optimization model based on a mixed integer second-order cone is established. In the first stage, discrete control devices such as the on-load tap changer and shunt capacitor are optimized. In the second stage, the uncertainties of DGs are considered to optimize the reactive power output of the DG. Then, a scenario reduction method is used to reduce the number of scenarios of the chance-constrained optimization method. Smulation results of a 95-bus system show that the proposed method can effectively eliminate the problem of security constraint violations, and achieve higher robustness with slightly increased network loss compared with the deterministic reactive power optimization method. This work is supported by the National Key Research and Development Program of China (No. 2017YFB0903705).
Keywords:uncertainties  active distribution network  reactive power optimization  two-stage chance constrained optimization method  reduced scenario method