首页 | 本学科首页   官方微博 | 高级检索  
     

1000 kV CVT运行状态下误差测试技术研究
引用本文:吴士普,吴细秀,李,汪本进,徐思恩,冯宇,邱进.1000 kV CVT运行状态下误差测试技术研究[J].电力系统保护与控制,2018,46(3):122-127.
作者姓名:吴士普  吴细秀    汪本进  徐思恩  冯宇  邱进
作者单位:中国电力科学研究院,湖北 武汉 430074,武汉理工大学,湖北 武汉 430070,中国电力科学研究院,湖北 武汉 430074,中国电力科学研究院,湖北 武汉 430074,中国电力科学研究院,湖北 武汉 430074,中国电力科学研究院,湖北 武汉 430074,中国电力科学研究院,湖北 武汉 430074
基金项目:国家电网公司科技项目(GYB17201600161)
摘    要:分析了1000 kV CVT运行状态下进行误差测试的必要性。讨论了温度的变化、频率、邻近带电体和二次负载等因素对CVT误差的影响。对比了1000 kV CVT在出厂试验、交接试验和在线运行时的接线差异。在此基础上提出1000 kV CVT运行状态下误差测量的原则和方法,并研制出一套1000 kV CVT误差在线测试系统。利用该系统完成了工程中运行状态下出线侧1000 kV CVT误差测试。本测试方法对后续的特高压工程的设计、施工、交接试验以及在线监测等都具有重要意义。

关 键 词:特高压  电压互感器  误差  测量  交接试验
收稿时间:2017/3/31 0:00:00
修稿时间:2017/8/25 0:00:00

Study on error test technology for 1000 kV CVT under operation condition
WU Shipu,WU Xixiu,LI Xuan,WANG Benjin,XU Sien,FENG Yu and QIU Jin.Study on error test technology for 1000 kV CVT under operation condition[J].Power System Protection and Control,2018,46(3):122-127.
Authors:WU Shipu  WU Xixiu  LI Xuan  WANG Benjin  XU Sien  FENG Yu and QIU Jin
Affiliation:China Electric Power Research Institute, Wuhan 430074, China,Wuhan University of Technology, Wuhan 430070, China,China Electric Power Research Institute, Wuhan 430074, China,China Electric Power Research Institute, Wuhan 430074, China,China Electric Power Research Institute, Wuhan 430074, China,China Electric Power Research Institute, Wuhan 430074, China and China Electric Power Research Institute, Wuhan 430074, China
Abstract:The necessary of error test for 1000 kV CVT under operation condition is analyzed. The factors influencing the CVT error such as temperature variation, frequency, adjacent charged body and the secondary load are discussed. The wiring difference of routine test, on-site acceptance test and online operation of 1000 kV CVT is compared. On this basis, the principle and the method of error measurement for 1000 kV CVT when operation are proposed and a 1000 kV CVT online error calibration system is developed. Appling the calibration system, error tests for 1000 kV CVT outlet side in engineering operation are finished. The error test provided is significant to the design, construction, on-site acceptance test, and online monitoring of subsequent UHV project. This work is supported by Science and Technology Project of State Grid Corporation of China (No. GYB17201600161).
Keywords:UHV  voltage transformer  error  measurement  on-site acceptance test
点击此处可从《电力系统保护与控制》浏览原始摘要信息
点击此处可从《电力系统保护与控制》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号