首页 | 本学科首页   官方微博 | 高级检索  
     

智能变电站二次系统仿真测试和集成调试新模式的探索和研究
引用本文:纪陵,李忠明,蒋衍君,裘愉涛.智能变电站二次系统仿真测试和集成调试新模式的探索和研究[J].电力系统保护与控制,2014,42(22):119-123.
作者姓名:纪陵  李忠明  蒋衍君  裘愉涛
作者单位:国电南京自动化股份有限公司,江苏 南京 210003;国电南京自动化股份有限公司,江苏 南京 210003;国电南京自动化股份有限公司,江苏 南京 210003;浙江电力调度控制中心,浙江 杭州 310007
摘    要:针对目前智能变电站二次系统测试和集成调试的环境搭建工作量大、配合环节多、调试周期长、高级应用功能难以进行整系统的集成调试问题,提出了一种智能变电站二次系统仿真测试和集成调试的新模式。以智能变电站应用功能测试和集成调试为中心,对二次系统集成测试进行了有效的分离。利用等效仿真和仿真测试技术手段,构建仿真测试系统,支撑各部分应用功能的测试和集成调试的进行,有效地提高了智能变电站二次系统各应用功能集成调试的效率,同时也达到和真实装置集成在一起进行集成调试模式同样的调试效果。为了实现智能变电站二次系统仿真测试和集成调试的新模式,还对站控层应用功能业务流嗅探技术和间隔层二次设备通用仿真技术进行了简单的阐述。该模式在智能变电站工厂集成测试、现场集成调试以及智能变电站改扩建调试中进行了实践和应用,取得了良好的效果,具有很好的经济效益和社会效益。

关 键 词:智能变电站  仿真测试  等效仿真  集成调试  新模式
收稿时间:6/2/2014 12:00:00 AM

Exploration and research of smart substation secondary system simulation testing and integration testing new mode
JI Ling,LI Zhong-ming,JIANG Yan-jun and QIU Yu-tao.Exploration and research of smart substation secondary system simulation testing and integration testing new mode[J].Power System Protection and Control,2014,42(22):119-123.
Authors:JI Ling  LI Zhong-ming  JIANG Yan-jun and QIU Yu-tao
Affiliation:Guodian Nanjing Automation Co., Ltd., Nanjing 210003, China;Guodian Nanjing Automation Co., Ltd., Nanjing 210003, China;Guodian Nanjing Automation Co., Ltd., Nanjing 210003, China;Zhejiang Electric Dispatch and Telecommunication Center, Hangzhou 310007, China
Abstract:At present, it has large amount of work in environment building, many coordination links, and long debugging period, and the problem that the advanced functions are difficult to make integrated debugging in the whole system in the secondary system test and integration test of smart substation. Aiming to that, this paper puts forward a new mode of intelligent substation secondary system simulation test and integration debugging test. It takes application function test and integration debugging of intelligent substation as the center and separates the integrated test of secondary system effectively. By means of equivalent simulation and simulation test, the simulation test system is constructed to support the application function test and integrated debugging, which not only effectively improves the efficiency of each application function integration debugging of intelligent substation secondary system, but also achieves the same debugging effects as using integrated debugging mode of integrating real device. In order to realize the new pattern, the traffic sniffer technology of station control layer application and the universal simulation technology of spacer layer secondary device are introduced. The model has been applied in smart substation factory integrated test, field integrated debugging and intelligent substation expansion debugging, and achieved good results, which has good economic benefit and social benefit.
Keywords:smart substation  simulation testing  equivalent simulation  integrated testing  new mode