An optimization approach for wind turbine commitment and dispatch in a wind park |
| |
Authors: | Carlos F Moyano João A Peças Lopes |
| |
Affiliation: | 1. Instituto de Engenharia de Sistemas e Computadores do Porto, Portugal;2. Faculdade de Engenharia da Universidade do Porto, Campus da FEUP, Rua Dr. Roberto Frias, 378 4200-465 Porto, Portugal;3. School of Engineering Systems, Faculty of Built Environment and Engineering, Queensland University of Technology, GPO Box 2434, Brisbane, QLD 4001, Australia |
| |
Abstract: | This paper describes an operational optimization strategy to be adopted at the wind park control level, that enables defining the commitment of wind turbines and their active and reactive power outputs following requests from Wind Park Dispatch Centers, assuming that individual wind turbines short-term wind speed forecasts are known and are expressed as power availability. This operational strategy was also developed with a concern on the minimization of the connection/disconnection changes of the individual wind generators, for a given time horizon. When identifying the active/reactive dispatching policies, wind generators loading capabilities are also taken in account. This optimization tool is especially suited to manage large wind parks. |
| |
Keywords: | Wind power generation Active and reactive power dispatch Optimization strategies |
本文献已被 ScienceDirect 等数据库收录! |
|