首页 | 本学科首页   官方微博 | 高级检索  
     

岭澳核电站二期常规岛及BOP接地系统简析
引用本文:秦高原.岭澳核电站二期常规岛及BOP接地系统简析[J].安徽电力,2010(3).
作者姓名:秦高原
作者单位:广东省电力设计研究院;
摘    要:介绍了广东岭澳核电站二期常规岛及BOP(Balance of plant电站辅助设施)接地系统的设计情况,从功能、设备等方面论述核电站接地系统的设计原则和具体方法,为核电站工程的接地系统设计提供了可借鉴的方法,并指出了进一步优化的可能。

关 键 词:核电站  常规岛  BOP  接地系统  设计  

Introduction for Design of Conventional Island and BOP Grounding System in Ling Ao Nuclear Power Station Phase 2
Abstract:This paper introduces the design of conventional island and BOP grounding system in Ling Ao nuclear power station phase 2 in Guangdong province.The design philosophy and detailed design method of the grounding system in view of its function and equipment are discussed which provides grounding system mode for reference in nuclear power stations and points out the possibility of optimization.
Keywords:nuclear power station  conventional island  BOP  grounding system  design  
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号