首页 | 本学科首页   官方微博 | 高级检索  
     

湖南省1号风电场穿透功率极限研究
引用本文:徐超,陈剑,谢欣涛.湖南省1号风电场穿透功率极限研究[J].湖南电力,2010,30(4):17-20,51.
作者姓名:徐超  陈剑  谢欣涛
作者单位:湖南省电力公司试验研究院,湖南长沙,410007
摘    要:随着风能大范围的推广应用,湖南省规划建设1号风电场。通过分析计算1号风电场的穿透功率极限及其影响因素,为规划设计1号风电场提供参考。

关 键 词:风电场  穿透功率极限  直驱永磁同步发电机

Research on power penetration limitation of No.1 wind farm in Hunan
XU Chao,CHEN Jian,XIE Xin-tao.Research on power penetration limitation of No.1 wind farm in Hunan[J].Hunan Electric Power,2010,30(4):17-20,51.
Authors:XU Chao  CHEN Jian  XIE Xin-tao
Affiliation:(Hunan Electric Power Test & Research Institute, Changsha 410007, China)
Abstract:With popularization and application of large-scale wind energy, Hunan province plans to build No. 1 wind farm. Based on analysis and calculation of power penetration limit on No. 1 wind farm and its influence factors, this paper gives references for plan and design of No. 1 wind farm.
Keywords:wind farm  wind power penetration limit  direct-drive permanent magnet synchronous generator
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号