首页 | 本学科首页   官方微博 | 高级检索  
     

北江大跨越工程立塔及架线施工技术的改进
引用本文:郭伟,郑少鹏,聂金鸿.北江大跨越工程立塔及架线施工技术的改进[J].电力建设,2009,30(10):33-36.
作者姓名:郭伟  郑少鹏  聂金鸿
作者单位:广东火电工程总公司,广州市,510730
摘    要:在立塔施工中,采用了可拆卸塔吊内附着抱箍和专设塔吊高空解体装置,提高了立塔施工效率;在架线施工中,采用了“二牵二”倒拉和“尾送”放线技术,解决了山区大跨越特殊地理条件下放线张力过大的难题。北江大跨越工程的立塔和架线技术的改进可为后期类似工程提供参考方案。

关 键 词:大跨越  立塔  架线  可拆卸塔吊  塔吊高空解体  二牵二  尾送

Improvement on Tower Erection and Line Stringing Technology in Beijiang Large Crossing Span Project
GUO Wei,ZHENG Shao-peng,NIE Jin-hong.Improvement on Tower Erection and Line Stringing Technology in Beijiang Large Crossing Span Project[J].Electric Power Construction,2009,30(10):33-36.
Authors:GUO Wei  ZHENG Shao-peng  NIE Jin-hong
Affiliation:GUO Wei,ZHENG Shao-peng,NIE Jin-hong(Guangdong Power Engineering Corp.,Guangzhou 510730,China)
Abstract:For tower erection,the technology of disassembled tower crane attached with holding hoop inside and special tower crane for air disassembling device was adopted to increase tower erection efficiency.For line stringing,two-pulling-two inverse pulling and offal send-off line stringing technologies were used to solve difficult problems of line stringing under excessive tension under special geographical conditions in mountain areas for large crossing.The improved tower erection and ling stringing technologies ...
Keywords:large crossing span  tower erection  line stringing  disassembled tower crane  tower crane in air disassembling  two-pulling-two  offal send-off  