配电系统中变电站智能化升级策略
引用本文:谭嫣,孙磊,齐峰,向丽玲,龙霏,林振智,文福拴.配电系统中变电站智能化升级策略[J].电力建设,2017,38(7).
作者姓名:谭嫣  孙磊  齐峰  向丽玲  龙霏  林振智  文福拴
作者单位:1. 广东电网有限责任公司电力调度控制中心,广州市,510600;2. 浙江大学电气工程学院,杭州市,310027
基金项目:国家自然科学基金项目,国家重点基础研究发展计划项目(973项目),广东电网有限责任公司科技项目(GDKJQQ20153001)Project supported by National Natural Science Foundation of China,the National Basic Research Program of China (973 Program)
摘    要:代表变电站技术发展趋势的智能变电站是智能电网的重要组成部分。智能变电站的配置对系统安全与经济运行具有重要影响,是值得研究的重要问题。在此背景下,研究了计及可靠性的配电系统中变电站智能化升级问题。首先,以变电站智能化升级成本和用户停电损失之和最小化为目标函数,考虑系统平均停电时间(system average interruption duration index,SAIDI)和电量不足平均值(average energy not supplied,AENS)这2个可靠性指标不超过给定阈值等约束条件,构建了配电系统中变电站的智能化升级优化模型。之后,发展了针对配电系统故障的故障清除模型,提出了评估用户停电时间的比较准确的方法。接着,对用户停电时间和用户停电损失函数进行线性化处理,得到变电站智能化升级问题的混合整数线性规划模型,并采用高效商业求解器求解。最后,以IEEE RBTS-Bus 4配电系统和丹麦某中压配电系统为例来说明所提方法的基本特征。

关 键 词:配电系统  智能变电站  可靠性  停电时间评估  混合整数线性规划

Intelligent Upgrading Strategy of Substations in Power Distribution System
TAN Yan,SUN Lei,QI Feng,XIANG Liling,LONG Fei,LIN Zhenzhi,WEN Fushuan.Intelligent Upgrading Strategy of Substations in Power Distribution System[J].Electric Power Construction,2017,38(7).
Authors:TAN Yan  SUN Lei  QI Feng  XIANG Liling  LONG Fei  LIN Zhenzhi  WEN Fushuan
Abstract:A smart substation, which represents the development trend of advanced substation technology, is an important part of a smart grid.The configuration of smart substation could have significant impacts on the secure and economic operation of the distribution system concerned, and is an important problem to be addressed.Given this background, this paper studies the intelligent upgrading strategy of substations in power distribution system with reliability indices considered.First, we construct the intelligent upgrading optimization model of substations in power distribution system to minimize the upgrade costs of existing conventional substations and the interruption costs of customers, with considering the constraint conditions that two reliability indices including the system average interruption duration index (SAIDI) and average energy not supplied (AENS) don`t exceed a given threshold.Secondly, we present a fault clearing model for power distribution system and propose an accurate assessment method for the user`s outage time.Then, we linearize the user`s outage time and outage cost function to obtain a mixed integer linear programming model for the intelligent upgrading strategy of substations, which is solved by efficient commercial solvers.Finally, the IEEE RBTS-Bus 4 distribution power system and an actual medium voltage distribution network in Denmark are served for demonstrating the basic characteristics of the presented method.
Keywords:distribution system  smart substation  reliability  outage time assessment  mixed integer linear programming