摘    要:西宁—格尔木750 kV输电线路工程LV-40塔拉线基础拉棒总重134.94 kg,拉棒系统悬浮于基础中,其搬运、定位、校正存在较大难度,且耗时,精度难以保证。焊接假肢后,增强了底部稳定性,消除了安装搬运过程中的安全隐患,减轻了校正工作量,提高了施工精度。

关 键 词:假肢  辅助  安装  拉棒

Installation of Guyed Foundation Drawn Rod for LV Type Tower Using Artificial Limb Auxiliary
DAI Jin-song,ZHOU Si-yuan.Installation of Guyed Foundation Drawn Rod for LV Type Tower Using Artificial Limb Auxiliary[J].Qinghai Electric Power,2012(3):58-60,69.
Authors:DAI Jin-song  ZHOU Si-yuan
Affiliation:DAI Jin-song,ZHOU Si-yuan
Abstract:The total weight of LV-40 tower’s guyed foundation drawn rod of 750kV Xining-Golumd transmission engineering is 134.94kg,and its drawn rod suspends in the foundation.Its transport,location and calibration is rather different and expends time,thus the accuracy can not be ensured.The bottom stability obviously enhanced after welding the artificial limb,therefore eliminates hidden trouble in installation and transport process,reduces calibration workload and improves construction accuracy.
Keywords:artificial limb  auxiliary  installation  drawn rod