首页 | 本学科首页   官方微博 | 高级检索  
     

电网运行状态下的概率优化调度
引用本文:查浩,韩学山,杨朋朋.电网运行状态下的概率优化调度[J].中国电机工程学报,2008,28(28):54-60.
作者姓名:查浩  韩学山  杨朋朋
作者单位:山东大学电气工程学院,山东省,济南市,250061
摘    要:构建电网运行状态下的有功功率概率优化调度模型,该模型以期望运行效益最大化为目标,采用马尔可夫链对系统未来调度时段的预想事故状态概率进行预测,在满足所有预想事故发生前后状态所对应约束集下获取调度解。其中,在容许时间内,针对预想事故发生后可能出现的系统安全破坏情形,以发电机组允许的输出功率再调整、紧急负荷中断及输电元件短时允许过载量作为有机牵制扩展到约束集中,并考虑相应安全校正措施的费用代价。该模型实现了电网运行状态概率预测与有功调度决策的紧密结合,可得到系统期望最大运行收益的时序变化曲线及各时段下风险收益概率均衡的调度方式。以IEEE-14节点系统为例进行测试分析,论证所提模型的合理性和有效性。

关 键 词:电力系统  概率优化调度  期望运行效益最大化  马尔可夫链  风险收益协调
收稿时间:2007-09-03

Probabilistic Optimal Dispatching Under Operating Condition of Power Network
ZHA Hao,HAN Xues-han,YANG Peng-peng.Probabilistic Optimal Dispatching Under Operating Condition of Power Network[J].Proceedings of the CSEE,2008,28(28):54-60.
Authors:ZHA Hao  HAN Xues-han  YANG Peng-peng
Abstract:A probabilistic active power optimal dispatching model under the power network operating condition has been established in this paper. With the forecasting probabilities of contingency states in future period by Markov chain, the optimal dispatching results can be obtained with the objective of maximizing the expected operating benefit and constraint-set of both pre-contingency and post-contingency state. And for the possible security breaking case during the post-contingency state, the unit ramping, emergent load interruption and transmission component short-term over loading within allowable time have been included in the constraint-set, also the cost of these corrective measures have been taken into account. Therefore, the forecasting probability of the power network operational state and active power optimal dispatching decision-making are close combined in this model, which can attain the curve of expected operating maximal benefit in different dispatching period, and can get the balanced dispatching mode under the probabilistic framework of harmonizing risk with benefit corresponding to that period, particularly adapting to the power system active power dispatching under market environment. At last, the analysis for IEEE-14 test system demonstrates the rationality and validity of this proposed model.
Keywords:power system  probabilistic optimal dispatching  expected operating maximal benefit  Markov chain  risk-benefit coordinating
本文献已被 万方数据 等数据库收录!
点击此处可从《中国电机工程学报》浏览原始摘要信息
点击此处可从《中国电机工程学报》下载全文