首页 | 本学科首页   官方微博 | 高级检索  
     

基于两阶段随机优化建模的新能源电网灵活性资源边际成本构成的机理分析
引用本文:王蓓蓓,仇知,丛小涵,郑亚先,冯树海.基于两阶段随机优化建模的新能源电网灵活性资源边际成本构成的机理分析[J].中国电机工程学报,2021(4):1348-1359.
作者姓名:王蓓蓓  仇知  丛小涵  郑亚先  冯树海
作者单位:东南大学电气工程学院;中国电力科学研究院南京分院
基金项目:国网公司科技项目:支持统一市场、两级运作的日前电能现货市场模拟推演技术研究与应用。
摘    要:针对大规模可再生能源并网给电力系统安全稳定运行造成的影响,考虑纳入燃气轮机储能等灵活性资源共同调节风电的波动性,构建了机组出力和备用容量联合优化的两阶段发电调度随机规划模型,并计及常规火电机组的多运行状态约束。然后,以模型中两阶段功率平衡约束对应的拉格朗日乘子分别作为日前和实时电价,从模型角度探究了边际成本构成机理。从灵活性资源供应的紧缺程度和灵活性资源需求的旺盛程度两个方面剖析灵活性资源的供需匹配对于系统边际电价的深层影响机理。算例结果说明了灵活性资源在应对风电不确定性和抑制尖峰电价的有效性,同时说明了多时间尺度的爬坡约束耦合、日前备用与实时出力调整量的耦合对于系统边际电价的影响。

关 键 词:发电调度  日前调度  储能  灵活性资源  边际电价

Mechanism Analysis of Flexible Resources’Marginal Price in New Energy Grid Based on Two-stage Stochastic Optimization Modeling
WANG Beibei,QIU Zhi,CONG Xiaohan,ZHENG Yaxian,FENG Shuhai.Mechanism Analysis of Flexible Resources’Marginal Price in New Energy Grid Based on Two-stage Stochastic Optimization Modeling[J].Proceedings of the CSEE,2021(4):1348-1359.
Authors:WANG Beibei  QIU Zhi  CONG Xiaohan  ZHENG Yaxian  FENG Shuhai
Affiliation:(Southeast University,Nanjing 210096,Jiangsu Province,China;China Electric Power Research Institute Nanjing Section,Nanjing 211102,Jiangsu Province,China)
Abstract:Due to the impact of the large-scale renewable energy on the safe and stable operation of power system,the flexible resources such as gas turbine and storage are considered to adjust the volatility of the wind power.A two-stage stochastic scheduling model co-optimizing energy and reserve was established,with constraints describing multi-operating states of conventional thermal power units.Then,the Lagrange multipliers corresponding to the two-stage power balancing constraints in the model were taken as the day-ahead and real-time electricity prices,respectively,and the mechanism of marginal cost from the perspective of model was explored.The influence mechanism of flexible resources on system marginal price was analyzed in depth from two aspects:the lacking degree and exuberant degree of demand for flexible resources.Case study illustrates the effectiveness of flexible resources in dealing with the uncertainty of wind power and restraining peak price.Moreover,the influence of coupling of multi-time scale climbing constraints and coupling of day-ahead reserve and real-time output adjustment on system marginal electricity price was analyzed.
Keywords:generation scheduling  day-ahead scheduling  energy storage  flexible resources  marginal price
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号