首页 | 本学科首页   官方微博 | 高级检索  
     

基于IFCM的共址接地极带电作业安全问题研究
引用本文:吴田,董晓虎,程绳,雷兴列,尹洪,杜勇,吴军.基于IFCM的共址接地极带电作业安全问题研究[J].陕西电力,2021,0(10):16-22,89.
作者姓名:吴田  董晓虎  程绳  雷兴列  尹洪  杜勇  吴军
作者单位:(1. 三峡大学 电气与新能源学院,湖北 宜昌 443002; 2. 国网湖北省电力有限公司检修公司,湖北 武汉 4300701; 3. 中国电力科学研究院有限公司,湖北 武汉 430074)
摘    要:针对共址接地极线路特殊运行工况及过电压分布特点,提出一种基于改进模糊C均值聚类(IFCM)的带电作业安全评估方法。首先通过建模并仿真计算获取共址接地极线路特殊运行工况下的过电压分布,确定了最大操作过电压;然后通过建立共址接地极放电试验模型开展冲击放电试验,利用改进的模糊 C 均值聚类对典型间隙的试验结果进行聚类,以达到获取各间隙放电电压U50的目的;最后通过绝缘配合方法确定共址接地极带电作业安全间隙距离,并结合实际工程进行安全性分析验证。所提出的研究方法和结论可为共址接地极线路带电作业的安全开展提供参考。

关 键 词:共址接地极  带电作业  安全距离  安全防护

Safety Live Working on Common Site Grounding Pole Line Based on Improved Fuzzy C-means Clustering
WU Tian,DONG Xiaohu,CHENG Sheng,LEI Xinglie,YIN Hong,DU Yong,WU Jun.Safety Live Working on Common Site Grounding Pole Line Based on Improved Fuzzy C-means Clustering[J].Shanxi Electric Power,2021,0(10):16-22,89.
Authors:WU Tian  DONG Xiaohu  CHENG Sheng  LEI Xinglie  YIN Hong  DU Yong  WU Jun
Affiliation:(1. College of Electrical Engineering and New Energy, Three Gorges University, Yichang 430072, China;2. Maintenance Company of State Grid Hubei Electric Power Co., Ltd., Wuhan 430074, China;3. China Electrical Power Research Institute, Wuhan 430074, China)
Abstract:Targeting the special operating conditions and overvoltage distribution characteristics of common grounding pole line, this paper proposes a safety assessment method for live working based on improved fuzzy C-means clustering(IFCM). Firstly, the overvoltage distribution is obtained under the special operating conditions of common grounding pole line through calculation, and the maximum operating overvoltage is determined. Then the impulse discharge test is carried out by establishing the common grounding pole line, and the cluster classification of experimentation results from the typical gap is made with the IFCM to obtain the discharge voltage U50. Finally, the safe gap distance for the live working of the common grounding pole line is determined by using the insulation coordination method, and the safety analysis and verification is conducted according to actual project.
Keywords:common site grounding pole  live working  safety distance  safety protection