Abstract: | After the storage of a hydropower station, leakage occurred between the stage I and II concrete work in gate slot concrete. The chemical grouting was adopted for down slope side. By making scientific grouting order and improving grouting technology, the leakage was successfully plugged up. Chemical grouting treatment to leakage of the hydropower station acquired preferably effect. |