首页 | 本学科首页   官方微博 | 高级检索  
     

梯级补偿效益分摊的变异系数-Shapley值法
引用本文:李英海,汪利,李清清,杨平,夏青青,牟春霞.梯级补偿效益分摊的变异系数-Shapley值法[J].水力发电学报,2020,39(9):11-22.
作者姓名:李英海  汪利  李清清  杨平  夏青青  牟春霞
作者单位:三峡大学三峡库区生态环境教育部工程研究中心,湖北宜昌443002;三峡大学水利与环境学院,湖北宜昌443002;三峡大学水利与环境学院,湖北宜昌443002;长江科学院水资源综合利用研究所,武汉430010;湖北寺坪水电开发有限公司,湖北襄阳441600;长江勘测规划设计研究有限责任公司,武汉430010
基金项目:三峡库区生态环境教育部工程研究中心开放基金;国家自然科学基金;三峡大学学位论文培优基金项目
摘    要:针对流域水能梯级开发中各水电站隶属于不同业主,在梯级水电站补偿效益分摊中既要保证梯级整体效益最大化,又要满足分摊结果公平合理的问题,将变异系数法与Shapley值法相结合,提出多业主梯级水电站补偿效益分摊的变异系数-Shapley值法,并将其应用于汉江中游南河流域梯级中的三级水电站补偿效益分摊实例中。结果表明,该方法不仅考虑了各水电站在参与联合调度时的自身贡献率,同时也兼顾了各水电站自身的装机容量、保证出力、调节库容、多年平均发电量等个体特征,实现了各水电站间补偿效益分摊的公平性与合理性,有利于提高各级水电站参与梯级联合调度的积极性,确保流域梯级联合调度效益最大化。

关 键 词:补偿效益分摊  多业主  梯级水电站  变异系数法  Shapley值法

Variation coefficient-Shapley value method for compensation benefits allocation of cascade hydropower stations
LI Yinghai,WANG Li,LI Qingqing,YANG Ping,XIA Qingqing,MOU Chunxia.Variation coefficient-Shapley value method for compensation benefits allocation of cascade hydropower stations[J].Journal of Hydroelectric Engineering,2020,39(9):11-22.
Authors:LI Yinghai  WANG Li  LI Qingqing  YANG Ping  XIA Qingqing  MOU Chunxia
Abstract:In view of the fact that hydropower stations in a river basin are the estate of different owners, the compensation benefit allocation of cascade stations should not merely ensure the maximization of overall benefit but meet equity and rationality. This paper describes a new method for compensation benefit allocation of the multi-owner stations, namely the variation coefficient-Shapley value method or a combination of the variation coefficient method and the Shapley value method, and applies it to the three-level cascade stations in the Nanhe valley of the middle Hanjiang. Results show that this method not only considers the contribution rates by various hydropower plants in joint scheduling, but also takes into account each plant’s capacity, output, adjustable reservoir capacity, multi-year average power generation and other individual characteristics. Thus, it helps achieve the equity and rationality of the allocation and promote each plant’s participation in the cascade joint dispatching, ensuring the benefit maximization of cascade joint scheduling.
Keywords:compensation benefits allocation  multi-owners  cascade hydropower stations  variation coefficient method  Shapley value method    
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《水力发电学报》浏览原始摘要信息
点击此处可从《水力发电学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号