首页 | 本学科首页   官方微博 | 高级检索  
     

三峡水库蓄水时机群决策方法研究
引用本文:王丽萍,李宁宁,马皓宇,阎晓冉,吴嘉杰.三峡水库蓄水时机群决策方法研究[J].水力发电学报,2020,39(7):61-72.
作者姓名:王丽萍  李宁宁  马皓宇  阎晓冉  吴嘉杰
作者单位:华北电力大学 可再生能源学院,北京102206;华北电力大学 可再生能源学院,北京102206;华北电力大学 可再生能源学院,北京102206;华北电力大学 可再生能源学院,北京102206;华北电力大学 可再生能源学院,北京102206
基金项目:“十三五”国家重点研发计划课题;中央高校基本科研业务费专项资金资助
摘    要:汛末提前蓄水能在风险可控的条件下提高水库蓄满率,增益良多。目前针对三峡水库汛末蓄水时机的研究很多,但侧重点不同,且最佳蓄水时机的选取缺少决策技术支持。为了将现有研究成果有效整合,供上级决策者参考,提出了专家群体最大满意度群决策模型。首先,各专家运用累积前景理论对蓄水时间方案进行排序,然后以专家群体满意度最大为目标,求解使专家群体满意度最大的群决策结果。结果显示,9月11日蓄水的方案可以在较小的风险条件下取得较大效益,为最优方案,该结果与传统决策方法结果相同,表明了所提群决策模型的有效性。此外,该模型充分考虑专家决策心理,尊重群体意见,结果有据可循,能为研究三峡汛末蓄水时机问题提供一种新的有效手段。

关 键 词:三峡水库  蓄水时机  专家满意度  前景理论  群决策

Group decision study on Three Gorges reservoir's water impounding schemes
WANG Liping,LI Ningning,MA Haoyu,YAN Xiaoran,WU Jiajie.Group decision study on Three Gorges reservoir's water impounding schemes[J].Journal of Hydroelectric Engineering,2020,39(7):61-72.
Authors:WANG Liping  LI Ningning  MA Haoyu  YAN Xiaoran  WU Jiajie
Abstract:Early impoundment at the end of flood season can improve the full storage rate of reservoirs at controllable risk and create significant benefits. Extensive studies have been conducted on the Three Gorges reservoir's operation schemes of water impounding at the end of flood season, but their focuses are quite different and they lack the support of decision-making technology in selecting water impounding schemes. This paper presents a group decision-making model of experts’ most-satisfaction to integrate the existing research fruits on the reservoir's impounding schemes for higher level decision making. We rank the available schemes using the method of cumulative prospect theory and the matrices of experts' decision, and then solve the model to maximize the satisfaction of the expert group. The results show that the best scheme is to start impoundment on September 11 and this can achieve greater benefits with a lower risk and agrees with the result of the traditional decision method, verifying the effectiveness of our group decision model. This model has fully considered experts' decision-making psychology and respects the group opinions of experts; thus it gives evaluation results that can be followed and provides a new effective approach to the reservoir's operation schemes of early water impounding.
Keywords:Three Gorges reservoir  water impounding time  experts' satisfaction  prospect theory  group decision-making  
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《水力发电学报》浏览原始摘要信息
点击此处可从《水力发电学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号