特约文章:响应电网负荷需求的梯级水电站短期调峰调度
引用本文:周建中,吴巍,卢鹏,李纯龙.特约文章:响应电网负荷需求的梯级水电站短期调峰调度[J].水力发电学报,2016,35(6):1-10.
作者姓名:周建中  吴巍  卢鹏  李纯龙
摘    要:


Short-term peak shaving of cascade hydropower stations in response to power grid load
ZHOU Jianzhong,WU Wei,LU Peng,LI Chunlong.Short-term peak shaving of cascade hydropower stations in response to power grid load[J].Journal of Hydroelectric Engineering,2016,35(6):1-10.
Authors:ZHOU Jianzhong  WU Wei  LU Peng  LI Chunlong
Abstract:How to make use of efficient clean hydropower for peak-valley adjustment is a key technique to release peak regulation pressure under the circumstance of increasingly urgent demand for peak shaving. A short-term peak shaving model for cascade hydropower stations has been developed in this study considering the minimum of residual load variance. A hybrid progressive particle swarm optimization algorithm is also described herein, combining a progressive optimality algorithm (POA) in the outer layer for compressing solution space and reducing dimension with a particle swarm optimization (PSO) in the inner layer for searching continuously and randomly. To update feasible regions adaptively, a new dynamic corridor technique was used for handling complicated time-space coupling. Application of this model to four stations on the Yuan River shows that the residual load variance of Hunan Grid can be decreased by 93.6% while keeping a steady and smooth curve of residual load. The method is very effective and useful in short-term peak shaving for cascade hydropower stations.
Keywords:
点击此处可从《水力发电学报》浏览原始摘要信息
点击此处可从《水力发电学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号