首页 | 本学科首页   官方微博 | 高级检索  
     

300MW机组DEH操作员站改造
引用本文:李明.300MW机组DEH操作员站改造[J].贵州电力技术,2014(7):82-84.
作者姓名:李明
作者单位:黔北发电厂,贵州金沙518000
摘    要:针对黔北电厂300MW机组只配有单台DEH操作员站的现状,简要阐述了操作员站改造的必要性,通过两种通讯方式的比较,最终择取串口通讯方式进行了改造并取得了预期的效果。

关 键 词:串口通讯  操作员站  300MW机组

Reconstruction of DEH operator station in 300 MW units
Li Ming.Reconstruction of DEH operator station in 300 MW units[J].Guizhou Electric Power Technology,2014(7):82-84.
Authors:Li Ming
Affiliation:Li Ming(Qianbei Electric Power Plant, Jinsha 518000 Guizhou, China)
Abstract:According to the situation that the number of DEH operator station was only one in 300WM units in Qianbei Power Plant, this paper elaborated the necessity of reconstruction for operator station. Through compared two kinds of communication methods, the serial port communication was chosen, which obtained the predictive effect.
Keywords:serial communication  operator station  300 MW units
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号