首页 | 本学科首页   官方微博 | 高级检索  
     

大电网安全可靠运行4级梯度预警预控方法
引用本文:王红印,张明亮,孙素琴,柴旭峥,付红军,李大鹏,王子琦,镐俊杰,孙含笑,胡扬宇,刘建军,周鹏,王景钢.大电网安全可靠运行4级梯度预警预控方法[J].电力系统自动化,2008,32(19):20-24.
作者姓名:王红印  张明亮  孙素琴  柴旭峥  付红军  李大鹏  王子琦  镐俊杰  孙含笑  胡扬宇  刘建军  周鹏  王景钢
作者单位:河南电力调度通信中心,河南省郑州市,450052
摘    要:采取系统、综合、在时间轴上延伸扩展的防御措施是避免大规模停电事故发生的重要途径之一。现有的预警和预防性控制系统大都集中关注于电网运行在线、实时、动态的安全稳定分析和事故防范措施,然而从电网运行生产的全过程出发能更好地实现综合防御的思想。提出一种4级梯度预警预控方法,即运用系统工程的思想在电网运行生产过程的4个重要环节,针对各自的特点开展预警分析和预防性协调控制。以此方法建立的预警预控系统的核心内容是周计划、日计划、操作前和实时4个时间递进环节上的安全稳定分析和有针对性的控制措施。介绍了大电网安全可靠运行4级梯度预警预控系统在河南电网的具体设计实施和关键技术。

关 键 词:大电网  预警预控方法    4级梯度  电力系统
收稿时间:2008/6/10 0:00:00
修稿时间:9/23/2008 1:36:53 PM

A Four-grade Forewarning and Preventive Control Method for Secure and Reliable Operation of Large Scale Power Grid
WANG Hongyin,ZHANG Mingliang,SUN Suqin,CHAI Xuzheng,FU Hongjun,LI Dapeng,WANG Ziqi,HAO Junjie,SUN Hanxiao,HU Yangyu,LIU Jianjun,ZHOU Peng,WANG Jinggang.A Four-grade Forewarning and Preventive Control Method for Secure and Reliable Operation of Large Scale Power Grid[J].Automation of Electric Power Systems,2008,32(19):20-24.
Authors:WANG Hongyin  ZHANG Mingliang  SUN Suqin  CHAI Xuzheng  FU Hongjun  LI Dapeng  WANG Ziqi  HAO Junjie  SUN Hanxiao  HU Yangyu  LIU Jianjun  ZHOU Peng  WANG Jinggang
Abstract:The systematic, synthetic and sequential preventing measures are one of the important methods of avoiding large-scale blackout. Most of the currently applied forewarning and preventive control systems focus on the dynamic, on-line and real-time security and stability analysis and precautions, but it is considered in this paper that proceeding from the whole process of power grid operation and production will better realize comprehensive prevention. The system engineering concept is applied to four important steps in power grid operation and production for direct security and stability analysis and preventive control. The crux of this method is security and stability analysis and the preventive control measures for four time step-up grades, i.e. weekly planning, daily planning, pre-operation and real time planning. The implementation and key techniques of a four-grade forewarning and preventive control system for secure and reliable operation of Henan power grid is described.
Keywords:bulk power grid  method of forewarning and preventive control  four-grade analysis step  power systems
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《电力系统自动化》浏览原始摘要信息
点击此处可从《电力系统自动化》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号