首页 | 本学科首页   官方微博 | 高级检索  
     

考虑条件断面限额自动匹配的一体化发电计划优化
引用本文:丁恰,杨军峰,王岗,张彦涛,曹荣章.考虑条件断面限额自动匹配的一体化发电计划优化[J].电力系统自动化,2020,44(20):79-85.
作者姓名:丁恰  杨军峰  王岗  张彦涛  曹荣章
作者单位:1.南瑞集团有限公司(国网电力科学研究院有限公司),江苏省南京市 211106;2.国电南瑞科技股份有限公司,江苏省南京市 211106;3.智能电网保护和运行控制国家重点实验室,江苏省南京市 211106;4.国家电网有限公司国家电力调度控制中心,北京市 100031;5.国网江苏省电力有限公司,江苏省南京市 210024
基金项目:国家电网公司科技项目(1200-201940420A-0-0-00)。
摘    要:断面限额是电网安全可靠运行的重要边界条件。随着电网规模的扩大,互联电网运行方式复杂多变,很多断面限额仅在一定的机组开机方式或者相关支路潮流水平等条件下适用,甚至这些条件断面之间也会存在相互关联。传统基于人工经验的起效条件判定需反复尝试断面限额进行发电计划优化,使得发电计划优化决策过程非常复杂。文中在传统考虑固定断面限额的发电计划优化模型的基础上,针对条件断面限额依据相关变量所属区间进行判定的特点,提出一种发电计划和条件断面限额一体化优化建模技术。该模型可实现条件断面限额与发电计划自动匹配,在保障电网安全的同时进一步挖掘电网输送潜力。最后,基于所提模型对断面潮流区间、开停机台数等典型的条件断面限额场景进行算例分析,验证了该模型的有效性。

关 键 词:断面限额  发电计划  安全约束  优化模型
收稿时间:2020/4/21 0:00:00
修稿时间:2020/6/8 0:00:00

Integrated Power Generation Plan Optimization Considering Automatic Matching of Conditional Transmission Section Limits
DING Qi,YANG Junfeng,WANG Gang,ZHANG Yantao,CAO Rongzhang.Integrated Power Generation Plan Optimization Considering Automatic Matching of Conditional Transmission Section Limits[J].Automation of Electric Power Systems,2020,44(20):79-85.
Authors:DING Qi  YANG Junfeng  WANG Gang  ZHANG Yantao  CAO Rongzhang
Affiliation:1.NARI Group Corporation (State Grid Electric Power Research Institute), Nanjing 211106, China;2.NARI Technology Co., Ltd., Nanjing 211106, China;3.State Key Laboratory of Smart Grid Protection and Control, Nanjing 211106, China;4.National Electric Power Dispatching and Control Center, State Grid Corporation of China, Beijing 100031, China;5.State Grid Jiangsu Electric Power Co., Ltd., Nanjing 210024, China
Abstract:Transmission section limit (TSL) is an important boundary condition for the safe and reliable operation of power grid. As the scale of the power grid expands, the operation mode of the interconnected power grids is more and more complicated and variable, and many TSLs are only applicable under such conditions as certain unit start-up mode or related branch power flow level, and even these conditional transmission sections are interrelated. The traditional determination of the onset condition based on human experience requires repeated attempts of TSLs to optimize the power generation plan, which makes the optimization and decision-making process of power generation plan very complicated. Based on the traditional optimization model of power generation plan that considers fixed TSLs, and aiming at the characteristics of the conditional transmission section limits (C-TSLs) determined by the intervals which the relevant variables belong to, this paper proposes an optimization modeling technique by integrating power generation plans and C-TSLs. This model can achieve the automatic matching of C-TSL and power generation plan, and further tap the transmission potential of the power grid while ensuring the safety of the power grid. Finally, based on the proposed model, an example analysis is made on typical C-TSL scenarios such as cross section power flow ranges and the number of running and shut down units to verify the effectiveness of the model.
Keywords:transmission section limit  power generation plan  security constraint  optimization model
点击此处可从《电力系统自动化》浏览原始摘要信息
点击此处可从《电力系统自动化》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号