首页 | 本学科首页   官方微博 | 高级检索  
     

计及联络线功率偏差处罚的AGC容量获取与调节策略
引用本文:赵学顺,甘德强,文福拴,黄民翔,余志伟,钟志勇.计及联络线功率偏差处罚的AGC容量获取与调节策略[J].电力系统自动化,2003,27(23):17-21,32.
作者姓名:赵学顺  甘德强  文福拴  黄民翔  余志伟  钟志勇
作者单位:1. 浙江大学电力经济与信息化研究所,浙江省,杭州市,310027
2. 浙江大学电力经济与信息化研究所,浙江省,杭州市,310027;香港大学电机电子工程学系,香港
3. 香港理工大学电机工程学系,香港
基金项目:高等学校博士学科点专项科研基金(2000033530),香港大学“种子”基金
摘    要:目前已经建立的一些省(直辖市)级电力市场,其所在的电力公司与属于同一大区的其他省(直辖市)的电力公司之间也通过联络线按计划交换一定的功率。在此背景下,针对仅发电侧开放的省(直辖市)电力市场,文中首先讨论了在需求不确定的情况下自动发电控制(AGC)的调节特性,提出了计及联络线偏差控制达不到要求导致被处罚的情况下AGC容量获取和调节的数学模型与求解方法。采用该模型可以确定最优的AGC调节容量和各台AGC机组的最优调度出力。最后通过一个简单的算例说明了该模型的基本特征。

关 键 词:电力市场  辅助服务  自动发电控制  联络线功率偏差处罚  需求不确定性  调节策略  容量获取
收稿时间:1/1/1900 12:00:00 AM
修稿时间:1/1/1900 12:00:00 AM

DETERMINATION OF AGC CAPACITY REQUIREMENT AND REGULATION STRATEGIES CONSIDERING PENALTIES OF TIE-LINE POWER FLOW DEVIATIONS
Zhao Xueshun,Gan Deqiang,Wen Fushuan,Huang Minxiang,C. W. Yu,C. Y. Chung.DETERMINATION OF AGC CAPACITY REQUIREMENT AND REGULATION STRATEGIES CONSIDERING PENALTIES OF TIE-LINE POWER FLOW DEVIATIONS[J].Automation of Electric Power Systems,2003,27(23):17-21,32.
Authors:Zhao Xueshun  Gan Deqiang  Wen Fushuan  Huang Minxiang  C W Yu  C Y Chung
Abstract:In a competitive electricity market, AGC services are either contracted via negotiations between the market operator and generation companies concerned, or procured via a certain form of auction. A new framework to determine AGC capacity requirement and to deal with regulation strategies under uncertain demand in a competitive electricity market is presented in this paper. First, the stochastic characteristics of AGC services are analyzed. A stochastic optimization decision-making model for determining optimal AGC capacity requirement is then developed, followed by a pricing analysis which reveals that a trade-off between economic efficiency and system security must be made by the market operator. Finally an optimal AGC regulating algorithm is suggested. A numerical study is given to further demonstrate the essential features of the proposed model and method.
Keywords:electricity market  ancillary services  automatic generation control (AGC)  penalties of tie-line power flow deviations  demand uncertainty
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《电力系统自动化》浏览原始摘要信息
点击此处可从《电力系统自动化》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号