首页 | 本学科首页   官方微博 | 高级检索  
     

基于输电网扩展规划的OPA模型
引用本文:王韶,祝金锋,董光德,张煜成,代江.基于输电网扩展规划的OPA模型[J].电力系统自动化,2011,35(20):7-12.
作者姓名:王韶  祝金锋  董光德  张煜成  代江
作者单位:输配电装备及系统安全与新技术国家重点实验室,重庆大学电气工程学院,重庆市400030
摘    要:针对已有利用直流潮流模拟连锁故障的OPA模型在慢动态过程中模拟线路升级方式的不足,提出一种基于输电网扩展规划的OPA停电模型。该模型不仅在模拟过程中考虑了通过增加传输容量升级线路,而且采用了输电网扩展规划方法新建线路实现电网升级,使慢动态模拟过程更加符合实际电力系统演化过程。用蒙特卡洛抽样方法获取快动态周期内每回线路的...

关 键 词:输电网扩展规划  OPA模型  连锁故障  自组织临界性
收稿时间:3/2/2011 5:31:22 PM
修稿时间:9/20/2011 6:48:45 PM

A Transmission Network Expansion Planning Based OPA Model
WANG Shao,ZHU Jinfeng,DONG Guangde,ZHANG Yucheng,DAI Jiang.A Transmission Network Expansion Planning Based OPA Model[J].Automation of Electric Power Systems,2011,35(20):7-12.
Authors:WANG Shao  ZHU Jinfeng  DONG Guangde  ZHANG Yucheng  DAI Jiang
Affiliation:(State Key Laboratory of Power Transmission Equipments & System Security and New Technology,Chongqing University,Chongqing 400030,China)
Abstract:To overcome the shortcoming of transmission lines update simulation in the slow dynamic process of the existing OPA model,an improved OPA model based on transmission network expansion planning is proposed.This model not only considers that transmission lines are updated by increasing their capacities,but also adopts the method of transmission network expansion planning to rebuild lines to achieve grid upgrading so that the simulation of the slow dynamic process is in more accordance with the evolution of a real power system.Monte Carlo sampling method is used to obtain the outage state of each line in the fast dynamic period,and the simulation of the operation mode of each state is used to determine whether cascading failures and loss of load will happen.The simulation results indicate that this model can simulate self-organized criticality of grid.Comparing with an example,it clearly explains that the outage scale of failures is influenced by the rebuilt lines in the transmission network while simulating cascading failures.Using transmission network expansion planning approach to holistically upgrade power grid can effectively enhance the grid against risks of cascading failure.
Keywords:transmission network expansion planning  OPA model  cascading failures  self-organized criticality
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《电力系统自动化》浏览原始摘要信息
点击此处可从《电力系统自动化》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号