首页 | 本学科首页   官方微博 | 高级检索  
     

运用连续二次规划法计算区域间极限传输容量
引用本文:刁勤华,默哈莫德·夏班,倪以信.运用连续二次规划法计算区域间极限传输容量[J].电力系统自动化,2000,24(24):5-8.
作者姓名:刁勤华  默哈莫德·夏班  倪以信
作者单位:1. 清华大学电机系北京 100084
2. 香港大学电机电子工程系香港
基金项目:国家重点基础研究专项经费资助! (G19980 2 0 30 5 ),香港政府大学研究基金 !(RGC)
摘    要:区域间功率交换的极限传输容量(TTC)是互联系统电力市场中的一个重要指标。文中运用连续二次规划法进行最优潮流计算,取得相应的TTC。其目标函数是在满足潮流方程和系统运行约束条件下寻求特定发电机群和负荷群之间的传输功率最大值。文中将无功功率作为OPF的控制变量,故节点电压也被优化以得到最大传输容量。采用最优潮流方法可以避免用连续潮流方法计算TTC而较为保守的缺点。给出了有关的数学模型和计算方法及流程。IEEE-30节点系统的计算结果表明了用该方法计算TTC的有效性和实用性。

关 键 词:电力市场    极限传输容量(TTC)    最优潮流(OPF)
收稿时间:1/1/1900 12:00:00 AM
修稿时间:1/1/1900 12:00:00 AM

INTER-AREA TOTAL TRANSFER CAPABILITY CALCULATION USINGSEQUENTIAL QUADRATIC PROGRAMMING METHOD IN POWER MARKET
T Diao Qinhua,Mohamed Shaaban,N i Yixin .Tsinghua U niversity,Beijing ,China.INTER-AREA TOTAL TRANSFER CAPABILITY CALCULATION USINGSEQUENTIAL QUADRATIC PROGRAMMING METHOD IN POWER MARKET[J].Automation of Electric Power Systems,2000,24(24):5-8.
Authors:T Diao Qinhua  Mohamed Shaaban  N i Yixin Tsinghua U niversity  Beijing  China
Affiliation:T Diao Qinhua1,Mohamed Shaaban2,N i Yixin2 1.Tsinghua U niversity,Beijing10 0 0 84,China 2 .The University of Hong Kong,Hong Kong,China
Abstract:Inter- area total transfer capability TTC is an im portant index in the power market of interconnected power system s. In this paper sequential quadratic programm ing SQP is used in the optimal power flow OPF approach to calculate the TTC.The objective function is to m axim ize the power transmission between specific generator s and load s subject to the constraints of load flow equations and system operation limits.Since the reactive power generation is taken as a control variable in the OPF formulation,the bus voltages can be optimized to yield maximum TTC.The adopted approach can avoid the conservative TTC results obtained from the continuation power flow method. The mathem atical formulation and TTC calculation procedure are presented. Computer results from the IEEE- 30 bus system show great potential of the proposed method in calculating TTC.
Keywords:power market  total transfer capability  optim al power f
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《电力系统自动化》浏览原始摘要信息
点击此处可从《电力系统自动化》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号