首页 | 本学科首页   官方微博 | 高级检索  
     

多目标优化分段竞标电力市场的研究
引用本文:马瑞,颜宏文,贺仁睦,王鹏,杨华春.多目标优化分段竞标电力市场的研究[J].电力系统自动化,2004,28(10):54-58.
作者姓名:马瑞  颜宏文  贺仁睦  王鹏  杨华春
作者单位:1. 长沙理工大学电气与信息工程学院,湖南省长沙市,410077;华北电力大学电气工程学院,北京市,102206
2. 长沙理工大学电气与信息工程学院,湖南省长沙市,410077
3. 华北电力大学电气工程学院,北京市,102206
基金项目:湖南省教育厅科研基金资助项目(02C064)。
摘    要:提出了一种兼顾污染物排放量最小和购电费用最小等多目标综合优化的电力市场分段竞标新模型。采用2种算法求解该模型:一是模糊算法.即首先分别求解各单目标分段竞标模型,接着将各目标函数模糊化,然后采用最大满意度法将多目标问题转化为新的单目标分段竞标问题,由此求得兼顾多目标的竞标结果;二是目标函数转化为约束算法,即将污染物排放量作为约束构成新的购电费用最小分段竞标模型。算例仿真结果表明了该模型的有效性。也表明该模型不仅具有分段竞标的优点,还可使经济、环保等多目标综合优化,从而体现竞标机组多因素贡献的公平性。

关 键 词:电力市场  分段竞标  多目标优化  模糊算法  约束算法
收稿时间:1/1/1900 12:00:00 AM
修稿时间:1/1/1900 12:00:00 AM

RESEARCH ON MULTI-OBJECTIVE OPTIMAL BLOCK BIDDING MODEL FOR ELECTRICITY MARKET
Ma Rui,Yan Hongwen,He Renmu,Wang Peng,Yang Huanchun.RESEARCH ON MULTI-OBJECTIVE OPTIMAL BLOCK BIDDING MODEL FOR ELECTRICITY MARKET[J].Automation of Electric Power Systems,2004,28(10):54-58.
Authors:Ma Rui  Yan Hongwen  He Renmu  Wang Peng  Yang Huanchun
Abstract:This paper presents a novel multi-objective optimization block-bidding model for electricity markets, which take the minimum of the pool purchase cost and the minimum of the pollution into consideration. It also proposes two algorithms to solve the novel multi-objective block-bidding model. One of them is fuzzy algorithm. Firstly, solving two single-objective blocks bidding model by normal algorithm and gaining the value of objective function and the bidding results. Then fuzzifying the multi-objective by using fuzzy sets theory and reformulating it into a new single-objective problem by means of max-min operator. Finally, acquiring the new bidding results for multi-objective optimal by solving the problem. Another algorithm is constraint algorithm. Regarding the minimum of pollution air as a constraint of the minimum pool purchase cost single-objective optimal problem, and solving the problem and gaining the new bidding results of multi-objective optimization. The numerical results show the validity of the model and two algorithms. Besides all benefits of the block bidding model, the model has the benefits of multi-objective optimization, therefore, it can ensure the fairness of multi-factor on generation bidder in electricity market.
Keywords:electricity market  block bidding  multi-objective optimization  fuzzy algorithm  constrained algorithm
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《电力系统自动化》浏览原始摘要信息
点击此处可从《电力系统自动化》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号