水电站10kV备自投设计的相关问题及解决方案
引用本文:李光耀,龚林平,封孝松,闫海峰.水电站10kV备自投设计的相关问题及解决方案[J].四川电力技术,2012,35(6):40-42,51.
作者姓名:李光耀  龚林平  封孝松  闫海峰
作者单位:溪洛渡电厂,云南永善,657300
摘    要:对溪洛渡水电站10 kV厂用电系统和厂用电备自投做了简单的介绍,针对备自投设计过程中遇到的问题,结合10 kV厂用电和备自投装置的实际情况,在备自投的开入、工作模式、闭锁和合闸闭锁等方面提出了优化的设计方案。

关 键 词:溪洛渡水电站  厂用电  备自投设计

Relevant Problems in Design of 10 kV Automatic Throw-in Equipment in Hydropower Station and Its Solutions
Affiliation:Li Guangyao Gong Linping Feng Xiaosong et al
Abstract:The 10 kV auxiliary power system and automatic throw- in equipment of Xiluodu Hydropower Plant are introduced briefly. For the problems encountered in the design process of automatic throw - in equipment, the optimization design scheme in aspects of input, working mode, locking and closing blocking for automatic throw - in equipment is proposed according to the actual situation of 10 kV auxiliary power and automatic throw - in equipment.
Keywords:Xiluodu Hydropower Plant  auxiliary power  design of automatic throw - in equipment