水电站10kV备自投设计的相关问题及解决方案 |
| |
引用本文: | 李光耀,龚林平,封孝松,闫海峰.水电站10kV备自投设计的相关问题及解决方案[J].四川电力技术,2012,35(6):40-42,51. |
| |
作者姓名: | 李光耀 龚林平 封孝松 闫海峰 |
| |
作者单位: | 溪洛渡电厂,云南永善,657300 |
| |
摘 要: | 对溪洛渡水电站10 kV厂用电系统和厂用电备自投做了简单的介绍,针对备自投设计过程中遇到的问题,结合10 kV厂用电和备自投装置的实际情况,在备自投的开入、工作模式、闭锁和合闸闭锁等方面提出了优化的设计方案。
|
关 键 词: | 溪洛渡水电站 厂用电 备自投设计 |
Relevant Problems in Design of 10 kV Automatic Throw-in Equipment in Hydropower Station and Its Solutions |
| |
Affiliation: | Li Guangyao Gong Linping Feng Xiaosong et al |
| |
Abstract: | The 10 kV auxiliary power system and automatic throw- in equipment of Xiluodu Hydropower Plant are introduced briefly. For the problems encountered in the design process of automatic throw - in equipment, the optimization design scheme in aspects of input, working mode, locking and closing blocking for automatic throw - in equipment is proposed according to the actual situation of 10 kV auxiliary power and automatic throw - in equipment. |
| |
Keywords: | Xiluodu Hydropower Plant auxiliary power design of automatic throw - in equipment |